My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-05-09 Special Called Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2009
>
03-05-09 Special Called Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:32 AM
Creation date
3/21/2025 2:57:25 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
3/5/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />#R 08-003 <br />P&Z 3/19/09 <br />Page 2 of3 <br /> <br />district is limited to administrative, wholesaling, manufacturing, and related compatible <br />uses, with suitable open spaces, landscaping, and parking areas". <br /> <br />The option of rezoning relates to the applicant's desire to provide future rail service to a <br />proposed motor freight warehouse. As per Section 106-521, Table A, industrial uses, <br />"Railroad Transportation is permitted in Heavy Industrial (HI) zoning district". However, <br />the applicant has pursued this option of rezoning to Planned Unit Development (PUD). <br />Multiple zoning designations for a parcel ofland are not suggested. <br /> <br />Analvsis : <br /> <br />In considering this request, Staff reviewed the following elements of the Comprehensive <br />Plan: <br /> <br />Land Use - One of the objectives of the land use element of the City's Comprehensive Plan <br />is to achieve orderly, contiguous development that is compatible with adjacent land parcels <br />and consistent with zoning. <br /> <br />The City's Land Use Plan indicates this area developing with commercial industrial uses. <br />Conformance of a zoning request with the land use plan is one consideration among several <br />criteria to be considered in approving or denying a rezoning application. <br /> <br />Transportation - The property in question has approximately 1000 feet of frontage along <br />the State Highway 146 North feeder road, which should accommodate traffic generated by <br />future development. In addition, railroad transportation could be available to this tract to the <br />north. <br /> <br />Highway Corridor Standards - One of the goals of the Comprehensive Plan is to include <br />consideration of landscaping, additional setbacks, visual attractiveness and the preservation <br />of green spaces along the major highway corridors. Special performance standards for <br />development in the Business Industrial zoning district stipulate compatible uses with open <br />spaces, landscaping, and parking. The subject property is located near the entrance gateway <br />to La Porte. Future development in this area should enhance the entrance corridor to the <br />City. <br /> <br />Special Use Performance Standards - Section 106-522, table B, industrial area <br />requirements of the Code of Ordinances show building setbacks for Business Industrial (BI) <br />zoning districts as Front 50', Rear 40', and Sides 30'. Maximum lot coverage (roofed over <br />improvements) is 50%. If approved to PUD, similar district setbacks of Front 50', Rear 40', <br />and Sides 30' should be retained with maximum lot coverage up to 50%. Currently, exterior <br />building design standards of 100% masonry/glass products are applicable to GC & BI zoned <br />properties along major thoroughfares. The specific requirement shall be applicable for the <br />requested rezoning as well. With a requested Planned Unit_Development district, stringent <br />building setbacks, lot coverage, and facade requirements will have positive aesthetic impacts <br />at the entrance corridor to La Porte. Having said parameters in place, future development <br />will not negatively impact the corridor enhancement plans for State Highway 225 and State <br />Highway 146. <br />
The URL can be used to link to this page
Your browser does not support the video tag.