My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-16-10 Regular Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2010
>
12-16-10 Regular Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:32 AM
Creation date
3/21/2025 2:57:39 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
12/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Landfill No.3 <br />Site Plan <br />Page 3 of 4 <br /> <br />Recommendation: <br /> <br />sewer is available to this property along North 8th Street. However, there is <br />no such request for public services at this time. <br /> <br />Proposed 10'xl0' dumpster site is shown near access along North <br />Broadway. Dumpster needs to be screened from public right-of-way. <br /> <br />Drainage - The proposed development lies within the FI0l Watershed and <br />naturally must drain west to North 8th Street and outfall north into HCFCD <br />Channel F 1 0 1. Drainage plan shows north and south detention ponds on <br />either sides of an access road. Developer will grade portion of North 8th <br />Street from discharge point to move the flow to the north into F 1 0 1 Channel. <br /> <br />Drainage analysis includes the new access road's impact on the post <br />development flow at points-of-demonstration (PODs). In all cases, the post <br />development peak flows remain less than pre-development flows for all <br />PODs. <br />A "Point of Demonstration" (POD) is a location where peak flow rates were <br />evaluated for the pre-development and post-development drainage analysis. <br />These PODs will serve as a basis for comparison to determine impacts to <br />existing drainage patterns. <br /> <br />Scope of Work - A list of proposed activities approved by the Texas <br />Commission on Environmental Quality (TCEQ) for the subject site is as <br />follows: <br /> <br />. Site Clearing <br />. Site Grading <br />· Repairing of the areas with waste exposed or seeps <br />· Adding fill soil over areas which have less than 2' of final cover <br />· Paving includes Lime/flyash stabilization of upper foot of soil <br />· Layer of Crushed Concrete with Geogrid (Envirogard) <br />reinforcement or upper layer of Asphalt <br />· Installation of Gas Vent Trenches and perforated pipes beneath <br />pavmg. <br /> <br />In addition, any waste excavated during process must be disposed to a <br />permitted MSW landfill. Any exposed waste left in place must be <br />properly capped. No waste shall be left exposed overnight. Locations <br />where waste was removed shall be backfilled and compacted to exceed <br />existing grade and provide positive drainage. Currently, TCEQ <br />authorization is only for re-grading and paving activities. The permit is <br />not valid for any enclosed structure or underground utilities. A copy of <br />the letter is attached to this report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.