My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-17-11 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2011
>
02-17-11 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:32 AM
Creation date
3/21/2025 2:57:42 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
2/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landfill Site #3 <br /> Page 3 of 4 <br /> Conclusion/ <br /> Recommendation: <br /> Staff feels that this project represents a significant impact to economic development <br /> within the City of La Porte. Based on the above analysis, staff recommends approval of the <br /> Special Conditional Use Permit with the following conditions: <br /> 1. This SCUP outlines in general terms the proposed Planned Unit Development. <br /> The developer recognizes and understands that any future construction or <br /> development anticipated by this SCUP and the approved plan shall require further <br /> submittal and approval of plats, site plans, construction drawings etc. <br /> 2. Plan submittals shall be in accordance with this SCUP, ordinances and policies of <br /> the City of La Porte and specifically Sections 106 -216 & 217 of the Zoning <br /> Ordinance. <br /> 3. Proposed construction shall be in accordance with the TCEQ authorization for re- <br /> grading and paving activities and not for construction of any enclosed structure or <br /> underground utilities. <br /> 4. Stacking of shipping containers shall be permitted in accordance with the <br /> Ordinance #1501 -II. <br /> 5. Storm water drainage will require on -site detention to mitigate any adverse impact <br /> associated with this development. North 8th Street will be graded from discharge <br /> point to move the flow to the north into F101 Channel. <br /> 6. A statement from the owner /developer specifying clear responsibility for <br /> maintenance of detention system (north & south ponds including channel /ditch <br /> shall be noted on the site plan. <br /> 7. The owner or developer shall develop a planting plan that includes Eucalyptus <br /> trees and creates a continuous visual screen. Trees shall be planted along North 8th <br /> Street and 400 feet along J & H Streets from an intersection with North 8 Street. <br /> Landscaping along North Broadway is also required in accordance with the City <br /> ordinance. <br /> 8. Provide an irrigation system to ensure that all landscaping and screening is <br /> properly maintained by the owner /developer. <br /> 9. An application of geotech surfacing shall be applicable per manufacturer's <br /> specification. Owner /developer shall provide proof to the City for on -site <br /> applications. <br /> 10. Provide the City a letter stating responsibility for the maintenance of the Landfill <br /> Site. <br /> 11. The owner /developer must secure a maintenance bond according to the City's <br /> Ordinances, seek an approved alternate showing evidence of bonding insurance, <br /> or participate in a "reserve fund mechanism" that establishes an account for the <br /> sole purpose of maintenance of the Landfill Site for the lifetime of the project. <br /> 12. This permit does not become valid until a Development Site Plan is submitted to <br /> the City; reviewed and approved in accordance with the requirements of the <br /> Development Ordinance and this Special Conditional Use Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.