My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-22-16 Regular Meeting of La Porte City Council
LaPorte
>
Agenda packets
>
City Council
>
2016
>
02-22-16 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 11:02:10 AM
Creation date
4/3/2025 3:13:34 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
2/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Staff recommends award of the contract to Gulf States Protective Coatings (GSPCI), the lowest <br />responsive bidder, in the amount of $243,025 with an additional change to the allowance for the logo <br />application at $30,000, for a total base bid of $273,025 and a project contingency of $24,000 (8.79%), <br />for a total authorization of $297,025. Additive bid item 1 may likely be used during construction and is <br />included in the project costs. GSPCI is an experienced water tank rehabilitation contractor that is <br />capable of completing the project in a timely and professional manner. <br />Benefits: <br />The existing tank structure is in good condition overall. The new interior coating will protect <br />the welded steel tank interior from corrosion. Minor repairs and exterior coating will extend the service <br />life of the structure and enhance the appearance of the water tower. <br />Liabilities: <br />The interior coating is no longer providing adequate protection to the steel. <br />Operating Costs: <br />No change <br />Other Considerations: <br /> Over-coating the exterior now eliminates the added expense of exterior <br />shrouding to conduct sandblasting down to bare steel. <br />Action Required by Council: <br />Consider approval or other action to authorize City Manager to enter into a contract with Gulf States <br />Protective Coatings in the amount of $273,025 and a project contingency of $24,000 for a total project <br />cost of $297,025. <br />Approved for City Council Agenda <br />Corby D. Alexander, City Manager Date <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.