Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Budget <br />Agenda Date Requested: June 27, 2016 <br />Source of Funds:Fund 033 <br />Requested By: Sharon Valiante <br /> <br />Account Number: 033-9892-927 <br />Department: Public Works <br />Amount Budgeted:$150,000 <br />Report: X Resolution: Ordinance: <br />Amount Requested:$100,136 <br />Exhibits: 2Bid Tabulation <br />Budgeted Item:YES_X_ NO___ <br />Exhibits: 3 Access Report Sealed Bid 16016 <br />Exhibits: 4 2016 Sidewalk Location Map <br />Exhibits 5 El Dorado Services, Inc. Bid Form <br />Exhibits 6FY16 Identified Sidewalk Repair List <br />SUMMARY & RECOMMENDATION <br />the public ramp/sidewalk program is now being administered by the Public Works Department. <br />The Department now manages and maintains 116 miles (612,480 LF) of public sidewalk <br />throughout the City. <br />To manage and maintain the public ramp/sidewalk infrastructure, it is important to know the <br />condition and what constitutes a repair. In October 1994, the City of La Porte developed a <br />Sidewalk Repair Program that established repair (in some cases of differential settlement, the slabs <br />can be raised using a pressurized grout mix) and/or replacement criteria differential settlement <br />of greater than 1 inch, severely broken, cracked slabs in more than 3 (three) places, and deflected <br />slabs that have been displaced by manholes, valve boxes or other utilities. In March 2012, the <br />Federal Government in accordance with the Americans with Disabilities Act (ADA) issued a <br />mandate that requires all new and/or repair to ramps be done in a manner that meets the current <br />standards. To determine which ramp and sidewalk locations meetthe C criteria, staff began <br />a sidewalk condition survey May 2016. The survey is approximately 90% complete with the <br />following observed: <br />1.Sidewalk inventory: 2,204,928 SF <br />2.Sidewalk meeting repair/replacement criteria: 26,508 SF <br />3.Sidewalk meeting repair criteria and eligible for removal and replacement: 26,508 SF <br />4.Sidewalk meeting repair criteria and are eligible for raising with pressurized grout: 8,384 SF <br />5.Sidewalk missing that can be constructed as infill: 4,460 SF <br />6.Ramps identified not meeting ADA Requirements: 175 ramps <br />7.Ramp locations identified but not installed/constructed: 50 ramps <br />Therefore, to m <br />ramp and sidewalk infrastructure, staff updated the sidewalk and ramp drawings and specifications <br />for compliance with the ADA guidelines, and worked with Purchasing to prepare a solicitation for <br />bid #16016 for Sidewalk Repair. The scope of the solicitation for bid includes the removal and <br />replacement of sidewalk meeting the repair/replacement criteria, the construction of sidewalk, and <br />the removal/replacement and/or construction of ramp sections not meeting the current updated <br /> <br />