Laserfiche WebLink
EXHIBIT C <br />Client: City of La Porte <br />Project Name: Pine Bluff Subdivision Improvements <br />Opinion of Probable Construction Cost <br />Item <br />Item DescriptionUnitQuantityUnit PriceExtended Price <br />No. <br />BASE BID <br />SECTION 1 - SITE PREPARATION FOR EARTH WORK <br />1 <br />Mobilization (No Greater Than 5% of Total Bid)LS1 $ 100,000.00 100,000.00$ <br />Remove and Dispose of Existing Pavement and Base (All <br />2 <br />SY6,500 $ 7.00 45,500.00$ <br />Depths) <br />3 <br />Remove and Dispose of Existing DrivewaysSY1,100 $ 8.00 $ 8,800.00 <br />4 <br />Remove Existing Outfall and CulvertLS1 $ 10,000.00 $ 10,000.00 <br />SUBTOTAL SECTION 1 <br />$ 164,300.00 <br />SECTION 2 - PAVING <br />5 <br />Lime Stabilized SubgradeSY9,300$ 46,500.00 <br />$5.00 <br />6 <br />Type A, Hydrated Lime <br />TON160$ 28,800.00 <br />$180.00 <br />7 <br />2-inch HMAC Type D Surface CourseTON930$ 111,600.00 <br />$120.00 <br />8 <br />6-inch Black Base <br />TON2,790$ 292,950.00 <br />$105.00 <br />9 <br />Asphalt/Concrete Driveways <br />SF9,900$ 79,200.00 <br />$8.00 <br />SUBTOTAL SECTION 2 <br />$ 559,050.00 <br />SECTION 3 - STORM SEWER <br />10 <br />Galveston Bay Outfall (36" RCP)EA1 $ 13,000.00 $ 13,000.00 <br />11 <br />24" RCP LF1,300 $ 90.00 $ 117,000.00 <br />12 <br />30" RCPEA800 $ 120.00 $ 96,000.00 <br />13 <br />36" RCP LF500 $ 140.00 $ 70,000.00 <br />14 <br />Type C ManholeEA8 $ 3,500.00 $ 28,000.00 <br />15 <br />12" Area Inlet (including PVC lead)EA10 $ 1,200.00 $ 12,000.00 <br />16 <br />Type E InletEA5 $ 2,500.00 $ 12,500.00 <br />17 <br />Type A InletEA24 $ 1,800.00 $ 43,200.00 <br />18 <br />Ditch RegradingLF1,500 $ 5.00 $ 7,500.00 <br />SUBTOTAL SECTION 3$ 386,200.00 <br />SECTION 4 - WATER ITEMS <br />19 <br />2-inch PVC Water Line <br />LF95030.00$ 28,500.00$ <br />20 <br />8-inch PVC Water LineLF3,570$ 65.00$ 232,050.00 <br />21 <br />8"x12" Tapping Sleeve and ValveEA2$ 6,000.00$ 12,000.00 <br />22 <br />2-inch Gate Valve and BoxEA6$ 350.00$ 2,100.00 <br />23 <br />8-inch Gate Valve and BoxEA8$ 2,000.00$ 16,000.00 <br />24 <br />Service ReconnectionsEA65$ 750.00$ 48,750.00 <br />25 <br />Fire Hydrant <br />EA53,000.00$ 15,000.00$ <br />SUBTOTAL SECTION 4$ 354,400.00 <br />SECTION 5 - WASTEWATER ITEMS <br />26 <br />6-inch PVC Sanitary Sewer <br />LF42050.00$ 21,000.00$ <br />27 <br />8-inch PVC Sanitary SewerLF1,860$ 60.00$ 111,600.00 <br />28 <br />Service ReconnectionsEA30$ 750.00$ 22,500.00 <br />29 <br />Sanitary Manhole <br />EA103,000.00$ 30,000.00$ <br />30 <br />Bypass Pumping <br />LS110,000.00$ 10,000.00$ <br />SUBTOTAL SECTION 5$ 195,100.00 <br />SECTION 6 - SWPPP <br />Erosion/Sediment Control in Accordance with TPDES <br />31 <br />Requirements, Including Notice of Intent (NOI) and Notice LS1500.00$ 500.00$ <br />of Termination (NOT) <br />32 <br />SWPPP Inspection and Maintenance, and ReportingLS1$ 2,000.00$ 2,000.00 <br />Sodding for Erosion Control (Block Sodding), St. <br />33 <br />SY6,3005.00$ 31,500.00$ <br />Augustine, Complete in Place <br />SUBTOTAL SECTION 6 <br />$ 34,000.00 <br />SECTION 7 - TRAFFIC CONTROL AND REGULATION <br />Traffic Control and Regulation, in Accordance with <br />34 <br />LS1 $ 15,000.00 15,000.00$ <br />Drawings and Specifications <br />SUBTOTAL SECTION 7 <br />$ 15,000.00 <br />TOTAL SECTIONS 1-7 <br />$ 1,708,050.00 <br />20% CONTINGENCY <br />$ 341,610.00 <br />TOTAL BASE BID PRICE <br />$ 2,049,660.00 <br />24 <br />D:\\Municipal\\Proposals\\Pine Bluff\\Cost Estimate 3-31-16Pine Bluff <br /> <br />