Laserfiche WebLink
4.F212-00-00-C001 Channel Conveyance Improvements -This project stems from the <br />Galveston Bay Watershed Planning study and consists of three components. <br /> <br /> Channel Deepening &/or widening from N. Broadway Street to N. Utah Street, <br /> Conversion of an open channel segment to a closed conduit using dual 8ft by 5ft <br />concrete boxes between N. Utah Street and Main Street, <br /> T <br />box culvert toward the outfall into the open channel section of F212. <br /> The project is currently in the Design Phase and scheduled to begin <br />construction in the early 2023. <br /> <br /> <br />5. A104-12-01 Bayside Terrace Partnership Project <br />th <br /> ILA Approved in CC Oct 26 <br /> HCFCD contribution $2.8M <br /> PER is complete and project is in design <br /> <br />6. City of La Porte Maintenance Request for Little Cedar Bayou F216 <br />-00-00 in the area of interest consists of the <br />following work and limits. <br /> <br /> This channel clearing was completed in December 2021. <br /> We completed this with UFL under V214 before the end of the year. Spent <br />$13,033.29. Work limits from LR 3280 to LR 5325. So basically, from an <br />obviously tidal section of the channel (footbridge just d/s of wave pool) up to <br />th <br />almost S. 8 St. where we pick up mowing again. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />