My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-01-11 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
.Agendas
>
La Porte Development Corporation/4B
>
2011
>
08-01-11 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:23:20 AM
Creation date
7/25/2025 10:36:52 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
8/1/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposal for Deb Gallington <br />Saira W. Schutza <br />4444 Westheimer Rd. Apt. 356 <br />Houston, TX. 77027 <br />sairaschutza@hotmail.com <br />231.392.6229 <br />Date: January 4, 2011 <br />Project: Mural for Mainly Drinks Coffee and Wine Bar <br />Scope of Work: Large-scale outdoor mural for Mainly Drinks. The exterior of the building on <br />which the mural will be located is approximately 19' wide by 10' high. The mural will be at <br />least 16' wide and S' tall. Any increases to the size of the mural will be done at the discretion of <br />Saira Schutza with agreement by Debra Gallington Style, and medium to be determined and will <br />be agreed upon by both parties before the work in commenced. The mural will be painted on a <br />medium that will be durable, weatherproof and suitable for exterior conditions. The final project <br />will be delivered to the site and will be the responsibility of Debra Gallington to adhere/mount <br />on the side of the building. Completion of the project will be determined as of the date of <br />delivery, <br />Payment & Fee Information: The fee to be paid is based on the work plan and schedule as <br />listed below. The final payment will consist of the Artist Fee plus reimbursement for any <br />supplies that were not previously paid and needed specifically for the project. This payment will <br />be made in installments before and after project commencement and completion as follows. <br />$200.00 for expenses and $200.00 for Artist's Fees are to be paid at the execution of this <br />Agreement, An additional payment of $500.00 in Artist's Fee will be paid at the completion of <br />Stage 1 as described in the section below. Expenses will be paid throughout the duration of the <br />project as submitted by Ms. Schutza. The final payment of $1,100 in Artist's Fees will be paid <br />upon the completion of the project. <br />Work Plan & Schedule: Schedule is provisional and is liable to change once project has <br />commenced. All dates are approximations. All fees are based on hourly pay rate of $20 per hour <br />and all material expenses are loose estimates based on similar projects that I have completed in <br />the past. An in depth material expense break down will be kept along with all receipts and <br />Exhibit C <br />
The URL can be used to link to this page
Your browser does not support the video tag.