Laserfiche WebLink
handed in as they are incurred. Meetings can be scheduled before, after and during each stage to <br />keep us focused and on the same page. <br />Stage 1- Research, Design & Concept Development: <br />January 6, 2010 -January 20, 2011 <br />Ideas and drawings exchanged in the development of design and concept of mural, <br />different media investigated. At this time, most materials for the project will be obtained. <br />Timeframe: at least 2-3 weeks and 1-2 meetings <br />Fees: $200 <br />Material Expenses: $200-300 <br />Stage 2- Production of Mural: <br />January 20,2011 -February 20, 2011 <br />Once the design of the mural is decided, mural will be made off site so production will <br />not be interrupted by inclement weather and will later be installed on site. Further <br />materials may be needed to complete this phase. <br />Timeframe: at least one month and 1-3 meetings <br />Fees: $1,600 <br />Material Expenses: $100-200 for materials <br />Final Fees: $1,800.00 <br />Final Material Expenses: $300-500 <br />Final Fees + Expenses: $2,100 - $2,300 <br />AGREED UPON on this the clay of January, 2011. <br />Debra L. Gallington <br />Safra W. Schutza <br />