My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-01-11 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
.Agendas
>
La Porte Development Corporation/4B
>
2011
>
08-01-11 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:23:20 AM
Creation date
7/25/2025 10:36:52 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
8/1/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF LA PORTE <br />QUOTE #1118 - DIRECTIONAL SIGNAGE <br />INTENT <br />The City of La Porte is seeking competitive quotes to complete a turn -key project to furnish <br />and install directional signs at various locations through -out the City of La Porte, TX 77571. <br />The signage, posts, and installation must meet all regulations, including TX -DOT requirements. <br />CONSTRUCTION <br />The signs should closely resemble the design and structure of attached Model Sign Design <br />and Construction. Signs shall be four (4) colors and will be determined by the City at a later <br />date. Signs shall contain the City of La Porte logo as it appears within this quote. <br />Construction shall meet the specifications below: <br />➢ Sign material — shall be quality, TX -DOT approved aluminum and perforated aluminum, <br />painted with automotive grade paint to ensure weathering and resistant to fading <br />➢ Letters — shall be exterior grade retro -reflective vinyl <br />➢ Posts — minimum three inch (Y) square with TX -DOT approved break -away base and <br />ball finial, powder -coated finish <br />➢ Post length shall not exceed 10' above grade and meet TX -DOT requirements <br />INSTALLATION <br />Successful contractor will be responsible for location of any underground utility lines prior to <br />installation of posts. Contractor will also be responsible for concrete breakout, if required, with <br />installation. <br />PERMITS <br />Prior to the start of work, the successful bidder shall obtain all required permits. City of La Porte <br />permit fees will be waived. <br />CLEAN-UP <br />All materials; tools; equipment etc, shall be removed or safely stored. All safety hazards to <br />workers or the public shall be corrected immediately and left in a safe condition at the end of each <br />work day. <br />REQUIRED CONTRACTOR INSURANCE: Successful CONTRACTOR shall provide a <br />certificate of insurance executed by an insurance company authorized to do business in Texas. <br />CONTRACTOR shall obtain insurance as detailed. Each policy obtained by the CONTRACTOR <br />for work with this contract, with exception of the Worker's Compensation policy, shall name the <br />
The URL can be used to link to this page
Your browser does not support the video tag.