My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-25-11 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2011
>
04-25-11 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2015 5:10:39 PM
Creation date
7/25/2025 11:25:12 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/25/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• - <br /> k <br /> the Coaipafiy Representative. <br /> 4.3 Trenches s1 be backfilled, sufficiently compacted to <br /> prevent future settlement., and crowned as required by <br /> the Company Representative. For any settlement that <br /> occurs as a result of access for the associated <br /> pipeline installation, the owner of the pipeline, upon <br /> request, shall fill or smooth the Company right -of -way <br /> as directed. <br /> 4.4 No structure of any type- shall be constructed on <br /> Company Property unless described in. detail ,in the <br /> formal agreement document, except for test point <br /> terminals. and pipeline markers, which shall be <br /> installed in locations such that they do not create an <br /> obstruction.to Company equipment traveling within <br /> Company Property <br /> Ird! 4.5 If at any time the pipe is abandoned, the pipe shall be <br /> removed by the pipeline owner. If the pipe cannot be <br /> removed bacause of possible damage to Company <br /> facilities (tower foundation, poles, etc.), the <br /> pipeline shall be cut 20' away from each side of the <br /> • <br /> Company facility and the abandoned pipe section filled <br /> with grout to prevent future caving or settling. <br /> 4.5 Pipelines with a proposed location between a Coiupany <br /> structure and a down. guy anchor or other appurtenance <br /> will be bored or tunneled unless specific approval has <br /> been granted by the Company Representative. <br /> 4.7 New or relocated pipeline occupations that are located <br /> hetween a lattice tower's foundations �aill require the <br /> Company to install 'Mower Guards" (Company Drawing <br /> 400G- 2Q3 -07) at each tower at the expense of the <br /> requesting pipeline company, <br /> 4.8 The fallowing are additional requirements applicable to <br /> installations of valve and metering sites within <br /> Company Property. <br /> 4.8.2 No valve site is to be located closer than fifty <br /> (50) feet to a transmission structure or <br /> appurtenance without exclusive written consent__ <br /> 4.8.2 Valve sites are to be located on Coinpany Property <br /> such that they do not limit access along Company <br /> property, <br /> REV. NO.5 I SPEC: W. 07 ,23i l 79 Sliest 11 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.