Laserfiche WebLink
SCOPE OF SERVICES AND RCSPONSIBHJTIES OF OWNER <br />.ARTICLE I <br />BASIC SERVICES: Freese and Nichols, Inc. (FNI) shall render the following professional services to <br />the City of La Porte (OWNER) in connection with the development of the Project, described as: West F <br />Street Drainage Improvements. <br />A. BASIC DESIGN PHASE <br />1. Overall Project management, scoping, contract administration, invoicing, quality control/quality <br />assurance. <br />2. Client coordination, progress meetings, and other meetings as required up to three (3) meetings. <br />3. Coordinate, gather, and review previous reports, plans, cost estimates, etc. <br />4. Conduct two (2) site visits to Project site throughout design phase to investigate and ascertain <br />and verify information. <br />5. Coordinate to receive from the OWNER the topographical and cross section survey data <br />OWNER has for the purpose of design. Supplemental mapping on PIP sheets will be performed <br />by FNI for the purpose of design. If additional field data is needed, OWNER will provide. <br />6. Based on the information from the OWNER and the topographical survey, prepare a drainage <br />area map for the design area. <br />7. Based on OWNER's storm sewer design criteria, drainage area map in Item 6, and 25 -yr <br />tailwater elevation in Little Cedar Bayou, determine the size of the proposed storm sewer line <br />from Little Cedar Bayou to west of 16' Street. Drainage computations will be based on <br />Rational Method. <br />8. Prepare construction plans, details, specifications, and contract documents for the following: <br />a. Design approximately 1,400' of storm sewer on West F Street from Little Cedar Bayou <br />to west of 16' Street. <br />b. Design and provide details for needed drainage structures at street intersections and <br />outfall at Little Cedar Bayou. <br />c. Design[ the removal of ditch on West E Street and redirect flows to West D Street and <br />then to Little Cedar Bayou. <br />9. Prepare plans and details for storm water pollution prevention. <br />10. Assemble and submit two (2) sets of 60 %- complete construction plans for OWNER's review <br />and comments. Meet with the OWNER to discuss comments. <br />11. Upon receipt of 60% complete review comments, FNI will complete design and construction <br />plans to 90 %- complete level including technical specifications and contract documents. <br />12. Assemble and submit two (2) sets of 90 %- complete construction plans for OWNER's review <br />and comments. Meet with the OWNER to discuss comments. <br />SC -1 <br />[OFF09041] L:lProposa]sTeuJ&r dV lWLPTJ - Drainage IrnprovementslC,w"Ct & Scope of Setvices.doc FNI� <br />OWNER <br />