My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-12-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2011
>
12-12-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2011 4:53:51 PM
Creation date
7/25/2025 11:27:07 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
12/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13. Prepare quantities and Engineer's opinion of probable construction cost for the project at 90 %- <br />and 100 % - complete levels. <br />14. Prepare the Harris County's Express Review Plan and submit construction plans and other <br />necessary documents to Hargis County for review and approval. It is our understanding that <br />OWNER has made provisions for the mitigation of drainage impact resulting from this project <br />in nearby detention pond and this has been coordinated with Harris County. <br />15. Provide coordination and furnish necessary information to utility and pipeline companies whose <br />facilities may be affected by this project. <br />16. Upon receipt of 90% complete review comments, FNI will finalize design and construction <br />plans including technical specifications and contract documents to 100%-complete level and <br />furnish two copies of construction plans, specifications, and bid proposals marked "Not For <br />Construction" for approval by the OWNER. Upon final approval by the OWNER, provide the <br />OWNER with three copies of the final construction plans for the purpose of construction. <br />B. BIDDING AND AWARD PHASE <br />1. Assist the OWNER by attending a Pre -Bid Conference, attending the bid opening, preparing <br />tabulation and analyses of the bids received, and furnishing recommendations on the award of <br />contracts or the appropriate actions to be taken by the OWNER. <br />2. Assist the OWNER in conducting a pre - construction conference with the Contractor. <br />C. CONSTRUCTION PHASE <br />The OWNER intends to handle the construction phase of the Project. Therefore, no budget is <br />provided. <br />D. SPECIAL SERVICES <br />Miscellaneous expenses such as mileage, printing, plotting, deliveries, etc. <br />ARTICLE H <br />ADDITIONAL SERVICES: Additional Services to be performed by FNI, if authorized by OWNER, <br />which are not included in the above described basic services, are described as follows: <br />A. Field layouts or the furnishing of construction line and grade surveys. <br />B. GIS mapping services or assistance with these services. <br />C. Property, boundary and right-of-way surveys, preparation of easement and deed descriptions, <br />including title search and examination of deed records. <br />D. Providing services to investigate existing conditions or facilities, or to make measured drawings <br />thereof, or to verify the accuracy of drawings or other information furnished by OWNER. <br />E. Providing renderings, model and mock -ups requested by the OWNER. <br />SC -2 <br />JOFFo"411 L nJ -Dra rage ]mprovementslContmtt & Swpe of 8w imdoo FN L-,1,e <br />OWNER <br />
The URL can be used to link to this page
Your browser does not support the video tag.