My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-12-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2011
>
12-12-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2011 4:53:51 PM
Creation date
7/25/2025 11:27:07 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
12/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F. Making revisions to drawings, specifications or other documents when such revisions are 1) <br />consistent with approvals or instructions previously given by OWNER or 2) due to other causes <br />not solely within the control of FNI. <br />G. Providing consultation concerning the replacement of any Work damaged by fire or other cause <br />during the construction, and providing services as may be required in connection with the <br />replacement of such Work. <br />H. Investigations involving consideration of operation, maintenance and overhead expenses, and the <br />preparation of rate schedules, earnings and expense statements, feasibility studies, appraisals, <br />evaluations, assessment schedules, and material audits or inventories required for certification of <br />force account construction performed by OWNER. <br />I. Performing investigations, studies and analyses of substitutions of equipment and/or materials or <br />deviations from the drawings and specifications. <br />J. Providing environmental support services including the design and implementation of ecological <br />baseline studies, environmental monitoring, impact assessment and analyses, permitting <br />assistance, and other assistance required to address environmental issues. <br />K. Design, contract modifications, studies or analysis required to comply with local, State, Federal <br />or other regulatory agencies that become effective after the date of this agreement. <br />L. Providing basic or additional services on an accelerated time schedule. The scope of this service <br />include cost for overtime wages of employees and consultants, inefficiencies in work sequence <br />and plotting or reproduction costs directly attributable to an accelerated time schedule directed by <br />the OWNER. <br />M. Providing services made necessary because of unforeseen, concealed, or differing site conditions <br />or due to the presence of hazardous substances in any form. <br />N. Providing value engineering studies. <br />O. Preparing statements for invoicing or other documentation for billing other than for the standard <br />invoice for services attached to this professional services agreement. <br />P. Geotechnical investigations. <br />ARTICLE III <br />TIME OF COMPLETION: FNI is authorized to commence work on the Project upon execution of this <br />AGREEMENT and agrees to complete the services called for in Article IA, 1B & ID (Design Phase, Bid <br />Phase and Special Services) so as to deliver completed Plans, Specifications, and Estimate of Cost for all <br />authorized construction of the Project, within ninety (90) calendar days, after receipt of Notice to Proceed. <br />Review periods by the OWNER, acquiring approvals from other Harris County have not been accounted <br />for. FNI will proceed with the performance of the services called for in Article IC (construction phase) of <br />this agreement upon request by the OWNER on as- needed basis. <br />If FNI's services are delayed or suspended in whole or in part by OWNER, or if FNI's services are <br />extended by the Contractor's actions or in actions for more than 90 days through no fault of FNI, IiNI may <br />be entitled to equitable adjustment of rates and amounts of compensation. <br />SC -3 <br />[OFF09041] L .Tropos0s%?eartand1MU001I - Drainage ImprovementslOwtract & Scope of SeMendoe FNI -:I�,7 <br />OWNER <br />
The URL can be used to link to this page
Your browser does not support the video tag.