My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-12 and 08-13-13 Regular Meeting, including Budget Workshop of La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2013
>
08-12 and 08-13-13 Regular Meeting, including Budget Workshop of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2013 12:24:01 PM
Creation date
7/25/2025 11:31:10 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
8/12/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ProfessionalEngineeringServicesScopeofWorkandFeeProposal <br />/z·äE[t©·;D;;©·©7{Þz·-wm;© <br />MOD1BasicEngineeringServicesRev.2 <br />BasicConstructionPhaseServices <br />Ourscopeofworkduringtheconstructionphaseanticipatesseven(7)tripsandsubmittal/RFI <br />review.Ourservicesarebrokendownasfollows: <br />ConstructionKickOffMeeting <br />Attendanceofone(1)constructionkickoffmeetingfortheentireproject.Pleaseprovidetwo <br />(2)daynotificationofscheduledmeetingtimeanddate. <br />Submittal/RFIReview <br />RespondtoallwrittenwCLxrshopdrawingandsubmittalreview.Shopdrawingsubmittalreviews <br />requireaminimumoffive(5)workingdaystoprocess.Pleasenotifyusifasubmittalreview <br />needstobeexpedited. <br />Pleasesendone(1)electroniccopy(onCDorPDFviaemail)ofeachsubmittalforreviewby <br />ouroffice.Wewillsendresponseviaemail.ShraderEngineeringreservestherighttomake <br />professionaljudgmentaldecisionsrelatedtooperationalparametersandphysicalconstruction <br />foritemssubmittedthatmightvaryfromdetailsoftheSpecificationsorPlans. <br />InterimInspection <br />Three(3)interiminspectionswillbeperformedtoobservethecontractorconstruction <br />progress.Itisanticipatedthateachoftheseinspectionswillincludeatriptoeachofthethree <br />sitesinasingleday. <br />FinalInspection <br />One(1)finalinspectionpersite(3total)oftheelectricalinstallationwillbeperformedtoconfirm <br />generalcompliancewithconstructiondocuments.Uponcompletionofthefinalinspectiona <br />detailedpunchlistofitemsinneedofcorrectionwillbesubmitted. <br />OneYearWarrantyInspection <br />Aoneyearwarrantyinspectionwillbeperformedandaninspectionreportwillbesubmitted.This <br />workwillbeperformedonanhourlybasis. <br />RecordDrawings <br />Recorddrawingssubmittedbycontractorwillbereviewedforaccuracyandcompleteness.CAD <br />drawingchangesarenotincludedbutcanbeprovidedonanhourlybasis. <br />AdditionalConstructionPhaseServices <br />AdditionalConstructionServiceswillbeperformedatanhourlyrateasrequestedorapproved <br />inwriting. <br />ShraderEngineeringInc.Page4of9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.