My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-28-19 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
01-28-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:36:02 AM
Creation date
7/25/2025 11:42:59 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
1/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r m y rr L 11 A yes .j, <br />HttIIT6 MLLARS, INC.. a 10350 Richmond Ave. a Suite 300 h Houston,. TX 77042.4248 1 281.49&0066 phone o 281.496.0220 Paz i huilt=zollors.com <br />January 3, 2019 <br />Don Pennell <br />Public Works Director <br />City of La Porte <br />2963 North 23rd Street <br />LaPorte, Texas 77571 <br />Reference: Public Works Service Center <br />Subject: Proposal for Facility Needs Assessment <br />Dear Mr. Pennell, <br />Huitt-Zollars, Inc. (Huitt-Zollars) appreciates the opportunity to provide this proposal for professional <br />architectural and engineering services to the City of La Porte (City) for preparation of a needs <br />assessment for the Public Works Service Center located on 23rd Street in La Porte, Texas (Project). Our <br />proposal is based upon the following scope of services, compensation, schedule and terms and <br />conditions. <br />SCOPE OF SERVICES: <br />1.0 Basic Services: <br />A. Task A - Programming Questionnaire: Huitt-Zollars shall prepare a programming questionnaire for <br />completion by selected City's staff. Upon receipt of the completed questionnaires, Huitt-Zollars will <br />prepare a space program spreadsheet for the building and the site. <br />B. Task B - Conduct a site visit to assess the condition of the facility (Architecture, MEP & Structure), <br />review utilization of existing spaces and observe operations. <br />C. Task C - Conduct program validation interviews with selected City's staff. During this meeting, we <br />will discuss the responses to the questionnaires and review the space program spreadsheet to fully <br />understand and evaluate a range of options before making critical decisions that will impact the design. <br />The purpose of this meeting is to: <br />1) Obtain input on the overall design concepts for the Project <br />2) Identify best land use and maximize useable space <br />3) Review the projected needs of the City <br />4) Identify and evaluate opportunities to improve operational efficiency <br />5) Review requirements for offices, plants, shops, storage, and other maintenance functions <br />6) Review administrative activities and requirements <br />7) Review public access <br />8) Review existing operational philosophy and policies, procedures, and techniques <br />9) Review contracted activities and requirements <br />10) Review communications (voice and data) and IT requirements <br />11) Review facility maintenance requirements that may affect material selection, plumbing, electrical, <br />heating, ventilation, and air conditioning <br />12) Review site and building security requirements <br />13) Review relationships and required adjacencies between functional areas <br />
The URL can be used to link to this page
Your browser does not support the video tag.