Laserfiche WebLink
City of La Porte Fairmont Park Lift Station <br />Attachment A Scope and Budget of Engineering Services <br /> <br />Description of Project and Budget <br /> <br />The project is to replace the existing four self-prime wastewater pumps with submersible pumps. The <br />site presently consists of three circular wet wells. The following are project objectives on which the <br />scope of work is based. <br /> Lift Station Capacity: Capacity is currently 1,100 gpm. The existing power feed and standby <br />generator are to be retained, and the force main is to be re-used. This power and force main <br />limitations are note expected to allow for an increase in capacity. <br /> Wet Well: The re-use of the existing wet wells or construction of a new wet well has not be <br />determined. <br /> <br />The scope of services to be provided are for Preliminary Design Phase and Final Design. The total <br />budget for all services is estimated at $171,100 (a level of effort is enclosed). The Initial Authorization <br />for Preliminary Design Services is $22,200. A subsequent authorization for an amount not to exceed <br />$148,900, for the Final Design and Subconsultant services will be provided once the scope of work and <br />associated level of effort is better defined. <br /> <br />Initial Authorization <br /> <br />The scope being authorized at this time includes Preliminary Design as outlined below. <br /> <br />Preliminary Design <br />This phase will identify options and recommendations with consideration of constructability and costs <br />while meeting the objectives. A brief description of the work and objectives of the tasks are as follows: <br /> <br />1. Information Collection and Evaluation: Readily available information (force main properties, <br />existing structure dimensions, pump discharge conditions) and/or assumptions from the City will <br />be gathered to establish a preliminary technical evaluation of major design factors (pump curve <br />sensitivity, preliminary pump selection, pump layout requirements, and pump horsepower <br />requirements) and options (primarily new wet well versus re-use of existing wet well) and pump <br />limitations based on the existing force main and generator. <br />2. Preliminary Report: A letter report will provide a summary of the options explored, and outline <br />maintenance and operation items for discussion. A meeting will be held with key City staff to <br />review the findings, address City questions and reach a consensus for direction. <br /> <br />A total of six weeks, after authorization to proceed, will be required to submit the preliminary report for <br />review. <br /> <br />Future Authorization <br /> <br />Engineer will develop a level of effort based on the scope of work identified as a result of the <br />Preliminary Design. The general scope for final design will be in two stages described as follows. <br />1 of 3 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />