My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-09-18 Drainage and Flooding Committee Meeting
LaPorte
>
.Agendas
>
Open Meetings
>
Drainage and Flooding Committee
>
Drainage Committee
>
2018
>
07-09-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:01:16 PM
Creation date
7/25/2025 11:51:55 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
7/9/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1) Northern Ditch Section (See Exhibit 3) - For approximately 1000 LF, the existing swale <br />will be expanded to 24 ft. bottom width channel, and the average depth is about 2.0 ft. The <br />existing drainage structure 24 will be replaced by a 24" pipe. This pipe functions as a <br />restrictor for this linear detention basin. This detention provides approximately 2.66 ac-ft. <br />of storage. <br />2) East Ditch Section - The right bank of the ditch (towards the airport side) will be sloped at <br />1% from the channel bottom to the existing ground elevation. The Ditch segments 7, 16, <br />and 21 are proposed to function as linear detention. The proposed channel section is about <br />300 ft. wide at the top (See Figure 10). The modifications to Ditch Segments 7 and 21 <br />provide approximately 4.80 ac-ft. of additional storage. <br />Improvements to the northern section involve about 7.5 ac-ft of soil excavation for both the linear <br />detention and conveyance improvement. <br />1? A <br />23 <br />22. <br />11. <br />20 <br />LLJ <br />19 <br />18 <br />1.d <br />00 <br />Linear Dtention, Catch Segment 21 <br />Prol:rorar-ed Ex6sUng. <br />-250 200 1.50 -1.00 -50 0 50 100 150 2R J <br />Station (rt) <br />Figure 10 Linear Detention Geometry <br />Other modifications to the ditch system include: <br />1) Several ditch sections will be lowered with minimal changes to bottom width or side slopes. <br />La Porte Municipal Airport — Offsite Drainage Analysis <br />HT&J, LLC, January 2018 Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.