My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-09-18 Drainage and Flooding Committee Meeting
LaPorte
>
.Agendas
>
Open Meetings
>
Drainage and Flooding Committee
>
Drainage Committee
>
2018
>
07-09-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:01:16 PM
Creation date
7/25/2025 11:51:55 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
7/9/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IML <br />Table of Contents <br />Tableof Contents....................................................................................................................1 <br />1. <br />Purpose and Need..........................................................................................................3 <br />2. <br />Criteria............................................................................................................................ <br />3 <br />3. <br />Existing Conditions......................................................................................................... <br />8 <br />4. <br />Rehabilitation Design....................................................................................................21 <br />5. <br />Affected Facilities not in this Project.............................................................................31 <br />6. <br />Conclusions and Recommendations............................................................................32 <br />7. <br />Schedule.......................................................................................................................34 <br />8. <br />Cost Estimates.............................................................................................................34 <br />9. <br />Modifications to Standards...........................................................................................35 <br />Figure 1 <br />- Taxiway Design Groups...............................................................................................6 <br />Figure2 <br />- Runway 12/30...............................................................................................................9 <br />Figure 3 <br />- Taxiway A Looking Southeast....................................................................................10 <br />Figure4 <br />- Runway 5 Markings....................................................................................................12 <br />Figure 5 <br />- Apron 2 Block Cracking..............................................................................................13 <br />Figure 6 <br />- Pipelines at the Airport...............................................................................................17 <br />Figure 7 <br />- XPSWMM Model Layout............................................................................................20 <br />Figure 8 <br />- Linear Detention Geometry ........................................................................................26 <br />Figure 9 <br />— Widened Ditch Geometry ...........................................................................................27 <br />Figure 10 - Widened Ditch Geometry along Farrington Road....................................................27 <br />Figure 11 - Altered Catchment Areas.........................................................................................29 <br />Figure 12 - Ponding at the Hangar Buildings During 100-yr Storm Event...................................30 <br />Figure 13 - Potential Pipeline Conflicts....................................................................................... <br />32 <br />Table 1 - <br />Rainfall Intensity Coefficients.........................................................................................7 <br />Table 2 - <br />Manning's n Values......................................................................................................14 <br />Table 3 - <br />Harris County Hydrologic Region 3 Rainfall (inches)...................................................17 <br />Table 4 - <br />Harris County Hydrologic Region 3 Loss Parameters.................................................18 <br />Table 5 - <br />Proposed Changes to Drainage Structures.................................................................28 <br />Table 6 <br />— Project Estimate of Probable Construction Cost ......................................................... <br />34 <br />List of Exhibits <br />1. Airport Layout <br />2. Pavement Distress Inventory <br />3. Effective Floodplain Maps <br />4. Drainage Structures <br />5. Existing Drainage Ditches <br />6. Existing Drainage System 5-year Inundation <br />7. Existing Drainage System 10-year Inundation <br />8. Existing Drainage System 100-year Inundation <br />9. Proposed Pavement Improvements <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.