Laserfiche WebLink
10. Proposed Drainage Improvements <br />11. Proposed Drainage System 5-year Inundation <br />12. Proposed Drainage System 10-year Inundation <br />13. Proposed Drainage System 100-year Inundation <br />List of Supplemental Tables <br />A. Pavement Distress Quantities <br />B. Watershed Data <br />C. XPSWMM Model Results <br />D. Water Surfaces vs. Pavement Elevations <br />E. Tabulation of Probable Construction Costs <br />Appendices <br />Appendix 1 — <br />XPSWMM 5-year Existing Model Output <br />Appendix 2 — <br />XPSWMM 10-year Existing Model Output <br />Appendix 3 — <br />XPSWMM 100-year Existing Model Output <br />Appendix 4 — <br />XPSWMM 5-year Proposed Model Output <br />Appendix 5 — <br />XPSWMM 10-year Proposed Model Output <br />Appendix 6 — <br />XPSWMM 100-year Proposed Model Output <br />IML <br />Page 12 <br />