My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
9-27-21 Regular Meeting of the La Porte Development Corporation Board
LaPorte
>
.Agendas
>
Open Meetings
>
La Porte Development Corporation/4B
>
2021
>
9-27-21 Regular Meeting of the La Porte Development Corporation Board
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 4:03:22 PM
Creation date
7/25/2025 11:59:59 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Agenda Packet
Date
9/27/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5200 Navigation Blvd. <br />I louston, 'FX 770 � I <br />www,at'�7e�,ic,!ai,)part(iRqcof7irc)l.cc)m 281-.328-82,96 <br />Name / Address <br />Aspendora Contiacmrs <br />Br�yarl Moore, <br />5 N I S & Itah <br />La f'orte,1A 77571 <br />Estimate <br />Date Estimate # <br />0/2 9/2 0 2002M28 <br />Project <br />Lay ish Designs, La I'm tc, I X <br />Dena ratio D d <br />Wess a Nump surn prrce is to be paid ffirthe fibregoing work. and is OeWiy So slateck it is undermood and agreed that the <br />qminl dies referred to ihme are estimates only and at frikyrnent shall be rnade at fife staled unit prices on die acmaN <br />Wmifi6e,s ofwork performed by American ParUng COntrol as determined uIvyn eompOkm offfie rvo& <br />-American Varking Control shall not be resfmsible for any damage to or deteriormion of any M'our work, whether <br />�amlp�eted or in pr(K"CSS, resulting from any cau.se, or causes beyond our control, but not ffinited to Iiiilure ofsub-gradc, <br />including soit volume changes, or faffiwe ofisuadequacy, 0�'any Inboy, or materiais riot fismished and NnstaHed by us, <br />whether or nw such fifflure or inadequacy, was or couki Ime Ix -en Uown at the fillIC arum W(Jrk was undetqakcn. <br />-,yimesa .mD llarkmng ControN is not responsible for removingvehicles firom repairare as, Anx-rican Parking Control %N40 <br />nofif� you in advarwe mid you must make arrangememts to have vehicles removed at your expemw- Any delays <br />experienced Nay Amt,rican Parking (.'Ontrof duc to unmoved vehicles can result in additional char p ,es due to down time, or <br />ad&fionad errs bifiz.afion co,;tn. <br />-In ffie event aH Work undef thiS COMUKA is not completed in one operation, American Parking Cl ontrol shall be paid in <br />fufl fair all hems ofwork cmnpeted upon the completion thercof. Any work under this con act fix- which Ame6can <br />Parking Control haq not received a "Ivorh' Order" Valfing for Completion wifhri (me year from the date ofthis agreement <br />wffl be subliect to renegotiaflon ofprices, or cancellation at Anwrican I'm ",ig Control's option. <br />,'rj'ej_jywS o IT a ' yment - Ilayment ram fiffl Ibr all work perlbrined hercunder during any mondt shall be inade no hater than the <br />lenth day of the month next loHowhig. FinM and complete payment ffir all Nvork peribrined he shafl Nor made upon <br />I Meresi at time late of( 15) perce'i ?t jV'r apill um Sim) i i'V Charged YO u <br />and p.0d by you on all anpaid balances from flte Muir( date to Ihe date, of'receipt ofpaynwnt by American flark4rg� Control <br />Reasombie anornev's fses, and cost ofoollection shall Ix., charged you and paid by you, ifincurred by us, <br />A signature m approval by any other means to the work lisled on this wntract will constifift the fiffl and con'ipletc <br />agreemem between us by the Wrms and conditions listed at*ve, <br />Chent Authodzed Sig.nwr <br />Sign flcre: <br />/%meHcan Parkfiig Cmttr(O <br />S�gn Herc� <br />Total St7,1 N7- l <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.