Laserfiche WebLink
I Numbered Notes: <br />rows of #4 bar long direction <br />equally spaced (3 rows in alt <br />bars @ 12" oc in short direction. <br />3, 8" Tall monument base (by <br />4. Laser etched monuments, <br />images will vary from site to site <br />(by others) <br />6Top of stem wall must be <br />cD completely flat to allow <br />monuments to sit plumb. <br />7. Anchor Bar drilled into existing <br />foundation and installed by <br />Monument Company. <br />18. 4" Concrete slab with light <br />broom finish, tool joints as shown. <br />Slope to drain. <br />Monument <br />