My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
9-27-21 Regular Meeting of the La Porte Development Corporation Board
LaPorte
>
.Agendas
>
Open Meetings
>
La Porte Development Corporation/4B
>
2021
>
9-27-21 Regular Meeting of the La Porte Development Corporation Board
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 4:03:22 PM
Creation date
7/25/2025 11:59:59 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Agenda Packet
Date
9/27/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
21'-4" <br />1. Top of stem wall below. <br />(Standard Rectangle.) Must <br />be perfectly level to place <br />3 <br />monument. <br />2. <br />Shaded areas are monument <br />bases, <br />3. <br />Short dashed are location of <br />vertical monuments to be <br />placed on top of monument <br />bases. <br />4. <br />Holes in monument bases and <br />---- — - <br />vertical monuments are by <br />monument stone provider. <br />CO <br />Monument stone installer will <br />drill and epoxy vertical dowels <br />after these bases are field <br />located. <br />5. <br />Exposed edges of monument <br />bases are rough cut, <br />L. I <br />concealed faces and tops are <br />polished smooth. <br />6. <br />Footing below. See Sheet 2. <br />Monument Base Placement Plan <br />Scale: 112"=1*-0" <br />Gckl Star FarnHles <br />T-7 27/32" <br />%/Lmion IN= Kcnlucky Monument Base Stone Placment Plan, August 6, 2019 A � 04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.