My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-16-15 Regular Meeting of the Planning and Zoning Commission
LaPorte
>
.Agendas
>
Planning/Inspections
>
Planning and Zoning Commission
>
2015
>
07-16-15 Regular Meeting of the Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:40:25 PM
Creation date
7/25/2025 1:15:19 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
7/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENTA <br />maintenance of the buffers, reserves and easements will be the responsibility of the contiguous <br />property owners pursuant to provisions of the deed restrictions, enforced by the POA. <br />The Open Space/Pedestrian Trail System shall be constructed within the drainage easements, the <br />detention pond/drainage system, landscape reserves, or public right-of-ways as dictated by the <br />final detention design. Ownership and maintenance of the Open Space/Pedestrian Trail System <br />and drainage/detention pond system shall be determined according to Article 5.1 of this <br />Agreement. <br />ARTICLE VI. SCHEDULE <br />6.1 Schedule. The Owner-Developer or Other Owners, as applicable, shall establish a <br />specific schedule for the development of and construction improvements on the Tract with the <br />end user(s). However, in lieu of and as the basis of that detailed schedule, the following work <br />program is anticipated: <br />Initiation of a complete engineering study, including drainage and preliminary <br />infrastructure design. <br />Detailed engineering design for Phase One, being all or a substantial part of the area <br />identified herein as Section One. This would include a rail connection to the main line <br />and a minimum spur connection to the first building anticipated, water and sanitary sewer <br />service, initial drainage, and detention to accommodate Phase One; <br />Construction of Wharton Weems Blvd., Powell Road, and Export Drive shall be <br />completed in accordance with the Traffic Study recommendations or as needed for <br />development purposes; <br />Initiation of procedure to abandon and relocate a portion of Powell Road, south of the <br />projection of Wharton Weems Blvd. within one (1) year of SCUP approval; <br />Platting, site plan, and detailed engineering plan review by the City of La Porte and <br />others; <br />Initiation of construction pursuant to item 6.1 above, identified as Phase One; and <br />Continuation of remainder of development as rapidly as market demands. <br />ARTICLE VII. FIRE PROTECTION, HAZARDOUS MATERIALS & SAFETY <br />7.1Fire Protection.The Owner-Developer shall formulate a plan for fire protection to serve <br />the Tract by separate agreement with the POA and respective grantees. <br />7.27.1 Hazardous Materials. The Owner-Developer agrees no hazardous materials as <br />identified in state and federal standards (NEPA) as well as City Fire Code, shall be stored on site. <br />Compliance will be enforced by the POA in concert with the City. <br />7.3Safety.The Owner-Developer shall formulate a public safety and training plan with the <br />City and POA, to ensure safe, efficient handling and storage of materials prior to issuance of a <br />building permit. <br />).docx- 5 - <br />H-02-Draft Development Agreement (showing changes <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.