My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-28-13 Zoning Board of Adjustment Meeting
LaPorte
>
.Agendas
>
Planning/Inspections
>
Zoning Board of Adjustment
>
2013
>
03-28-13 Zoning Board of Adjustment Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:24:40 AM
Creation date
7/25/2025 1:17:37 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
3/28/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The City has determined the primary structure is substandard and the cost of <br />bringing it into lawful compliance with codes and ordinances of the city will exceed 50 <br />percent of replacement cost of such structure. Our determination is based on the <br />following: <br />03/08/11 City's receipt of remodel permit application showing a remodel <br />valuation of $5,000 <br />03/08/11 Exterior inspection by City staff - preliminary determination`of�,���§� <br />structure. obsolescence (per 2011 "Certified" Harris County Appraisal I ,/ �- <br />District Improvement Valuation of $41,742) �� g <br />03/11/11 Set up 03/17/11 meeting with Owner --discussed issue. s <br />03/17/11 Met with.owner; questioned remodel valuation and raised -r <br />structure obsolescence issue; owner agreed to weigh demolition verses <br />cost to have erigmi eer review building <br />09/27/11 Survey identifying nonconforming structure locations <br />w 09/28/I 1 Engineering letter estimates re airs to the front of the.prirnary <br />building to be $25,800 plus additional cost <br />A 10/07/11 Owner's remodel permit application that reflected an estimated err <br />$80,000 for remodel valuation 'i4r� w,4s b 1--,a 6,* ¢ r �r.45i <br />® 12/13/11 On -site walk-thru of the building-WG/d'A , r A���� <br />® 0Ill 7/12 Report - Restricted UseAppraisal estimating the replacement <br />cost of the pft,rybuilding between $43 000 and $58 000 <br />In accordance with City Zoning Regulation Sect. 106-262(d), this letter serves as <br />your notification that the right to operate and maintain the "substandard non -conforming <br />structure(s) is terminated". An owner or his representative seeping to provide proof that <br />the structure's repair cost does not exceed 50 percent of the replacement cost of such <br />structure may appeal the enforcement officer's decision to the Zoning Board of <br />Adjustment (ZBOA). However, the burden of proof rests with the owner of such. <br />structure(s). For your convenience, we have enclosed_ the appeal application should you <br />choose to initiate the appeal process. (See attached) <br />If you wish to initiate the appeal process, please return the completed request <br />form and applicable fee. It should be returned to our City planner, Mr. Masood Malik <br />(604 W. Fairmont Parkway — La Porte, Tx 77571), so a meeting can be scheduled. Mr. <br />Malik can answer any questions relating to the process and can be reached at #281-470- <br />5058. I can be reached at 4281-470-5066. A scheduled ZBOA meeting will stay any <br />municipal court action until said meeting is concluded. Thank you. <br />
The URL can be used to link to this page
Your browser does not support the video tag.