Laserfiche WebLink
<br />. Existing pavement markings shall be removed according to the requirements of Item 677t <br />"Eliminating Existing Pavement Markings and Markers" and shall be completely removed to <br />the satisfaction of the Area Engineer. <br /> <br />. Preformed plastic pavement marking shall not be used. <br /> <br />. The Advanced Waming signing shown on BC (1 )-99 will be required. This includes the <br />following signs: EG 20-9 ER 20-5 with plaque CW 20-1D SO 20-1 with plaque and SG <br />20-6. . <br /> <br />. Proposed signs or those, which require relocation, shall be done in accordance to the <br />following standards: SMD (Gen.)-02 & SMD (Slip-I)-02 thru SMD (Slip-3)-02. <br /> <br />. All pavement markings shall be Type I Thermoplastic and shall meet the requirements of <br />Item 666, "Reflectorized Pavement Markings.'t All pavement surfaces shall be clean or <br />surface preparation in accordance with Item 678 "Pavement surface Preparation for <br />Markings" will be required. A Type n marking as a sealer in accordance with this item shall . <br />be placed prior to the Type I marking for concrete pavement. All old asphalt pavement will <br />require a Type II marking as a sealer as specified by the Area Engineer. <br /> <br />. The Texas Universal Triangular Slip Base Sign Suppolis will be required for all existing <br />signs to be relocated or proposed signs within TxDOT right-of-way. <br /> <br />. All trees requiring removal shall be planted on the TxnOT right-of-way as directed by the <br />Area Engineer. <br /> <br />. Wheel chair ramps must meet the requirements of the Standard PED-OS (4 sheets). <br /> <br />. The Contractor shall not create a dirt nuisance or safety hazard in any street. The pavement <br />shall be cleaned daily. <br /> <br />. Contractor shall get a traffic control plan approved at the Area Engineer 10 working days <br />prior to start of construction. Contractor is required to supply all sub-contractors with a copy <br />of this permit and approved traffic control plan. The contractor or sub-contractor is required <br />to contact the Maintenance Supervisor from 24 hours to 48 hours prior to commencing any <br />work. <br />