My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-17-08 Meeting of the La Porte Redevelopment Authority
LaPorte
>
.Agendas
>
La Porte Redevelopment Authority/TIRZ
>
LPRDA
>
2008
>
12-17-08 Meeting of the La Porte Redevelopment Authority
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2014 8:24:53 AM
Creation date
7/25/2025 3:00:15 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agendas
Date
12/17/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ADDITIONAL SPECIAL PROVISIONS FOR ROADWAY IMPROVEMENT PERMIT <br /> <br />. Any adjustments made to traffic signals shall be overseen and inspected by the Texas <br />Department of Transportation Signal Operation and Maintenance Section. Contact Mr. Doug. <br />Vanover at (713) 802-5661, 48 hours in advance of signal work. <br /> <br />.... <br /> <br />. Should the existing roadway pavement be damaged, during the traffic control set up to place <br />traffic on the shoulder, it shall be repaired as specified by Area Engineer. <br /> <br />- <br /> <br />. The Contractor shall employ at hislher expense, an approved commercial testing laboratory <br />to pour and break concrete beams for determining concrete strength (Test method TEX-448- <br />A Flexural Strength.) Certified reports by a Professional Engineer of each break shall be. <br />submitted to the TxDOT Area Engineer. The other required tests shall be TEX-415-A, slump <br />and TEX-416-A or TEX-414-A Entrained air. The frequency of sampling for flexural <br />strength shall be one test (2 beams) for each 3,000 s.y. Not less then one set of beams will be <br />required for each day's placement. This work shall be coordinated with TxnOT Area <br />Engineer's Office, 48 hours prior to pouring concrete. <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.