HDRIC &M Job No. 10 -105
<br />CITY OF LA PORTE
<br />Emergency Power to Warter and Wastewater Facilities
<br />Bid Date: 6/19/11
<br />Page 3OF3
<br />LOW BIDDER
<br />Cresent Electric
<br />Hi -Tech Electric, Inc.
<br />C.F. McDonald Electric, Inc.
<br />ITEM
<br />ITEM DESCRIPTION
<br />UNIT
<br />QUAN.
<br />UNIT
<br />TOTAL
<br />TOTAL
<br />UNIT
<br />TOTAL
<br />NO.
<br />PRICE
<br />AMOUNT
<br />PRICE
<br />AMOUNT
<br />PRICE
<br />AMOUNT
<br />BASE BID - WATER FACILITIES ITEMS
<br />Electrical System Installation -Water Plant No. 4. - Provide and install
<br />all work shown on plans and described in specifications including the
<br />14
<br />following: Provide and install manual transfer switch, generator breaker,
<br />generator connector, all required electrical work, concrete pads, and all
<br />required appurtenances as shown on plans and as described in
<br />specifications for a complete operating system for a lump sum of:
<br />LS
<br />1
<br />$25,000.00
<br />$25,000.00
<br />$23,278.00
<br />$23,278.00
<br />$34,813.00
<br />$34,813.00
<br />Electrical System Installation -Water Plant No. 7. - Provide and install
<br />all work shown on plans and described in specifications including the
<br />15
<br />following: Provide and install manual transfer switch, generator breaker,
<br />generator connector, all required electrical work, concrete pads, and all
<br />required appurtenances as shown on plans and as described in
<br />specifications for a complete operating system for a lump sum of:
<br />LS
<br />1
<br />$25,469.00
<br />$25,469.00
<br />$28,039.00
<br />$28,039.00
<br />$31,004.00
<br />$31,004.00
<br />Electrical System Installation -Water Plant No. 9. - Provide and install
<br />all work shown on plans and described in specifications including the
<br />16
<br />following: Provide and install manual transfer switch, generator breaker,
<br />generator connector, all required electrical work, concrete pads, and all
<br />required appurtenances as shown on plans and as described in
<br />specifications for a complete operating system for a lump sum of:
<br />LS
<br />1
<br />$25,000.00
<br />$25,000.00
<br />$34,213.00
<br />$34,213.00
<br />$50,550.00
<br />$50,550.00
<br />Electric Service — Lift Station No. 9 Include an "Allowance" for electric
<br />17
<br />service by the local Electric Service Provider. Exact amount will be
<br />reimbursed to Contractor upon submittal of invoice from Electric Service
<br />Provider for a lump sum of:
<br />LS
<br />1
<br />$5,000.00
<br />$5,000.00
<br />$5,000.00
<br />$5,000.00
<br />$5,000.00
<br />$5,000.00
<br />Electrical System Installation - Fairmont Water Plant - Provide and
<br />install all work shown on plans and described in specifications including
<br />the following: Provide and install manual transfer switch, generator
<br />18
<br />breaker, generator connector, all required electrical work, concrete pads,
<br />and all required appurtenances as shown on plans and as described in
<br />specifications for a complete operating system for a lump sum of:
<br />LS
<br />1
<br />$25,000.00
<br />$25,000.00
<br />$26,791.00
<br />$26,791.00
<br />$54,602.00
<br />$54,602.00
<br />TOTAL BASE BID - WATER FACILITIES ITEMS
<br />$105,469.00
<br />$117,321.00
<br />$175,969.00
<br />TOTAL BASE BID - WASTEWATER FACILITIES ITEMS
<br />$487,000.00
<br />$489,239.00
<br />$459,916.00
<br />TOTAL BASE BID - WATER FACILITIES ITEMS
<br />$105,469.00
<br />$117,321.00
<br />$175,969.00
<br />TOTAL BID ITEMS
<br />1 $592,469.001
<br />1 $606,560.00
<br />$635,885.00
<br />Bid Date: 6/19/11
<br />Page 3OF3
<br />
|