Laserfiche WebLink
BID TABULATION #11024 <br />PECAN PARK PEDESTRIAN TRAILS <br />AUGUST 2, 2011 <br />DESCRIPTION QTY <br />UOM <br />RW Lucas Construction <br />Unit Price Total Amt. Bid <br />GW Phillips Concrete <br />Construction <br />Unit Price <br />Total Amt. Bid <br />Brooks Concrete <br />Unit Price Total Amt. Bid <br />D.L. Meacham <br />Unit Price <br />Total Amt. Bid <br />Jerdon Enterprise <br />Unit Price Total Amt. Bid <br />AAA Asphalt & Paving <br />Unit Price Total Amt. Bid <br />MAR -CON Services <br />Unit Price <br />Total Amt. Bid <br />Site Pr,P &Mobilization <br />1 Site Preparation, to include Mobilization, Cleanup and LS <br />1 <br />$ 26,000.00 $ <br />26,000.00 <br />$ 25,000.00 $ <br />25,000.00 <br />$ 2,000.00 $ <br />2,000.00 <br />$ 6,700.00 $ <br />6,700.00 <br />$ 55,000.00 $ <br />55,000.00 <br />$ 21,000.00 $ <br />21,000.00 <br />$ 66,000.00 $ <br />66,000.00 <br />Demobilization <br />2 Traffic Control and Regulation LS <br />1 <br />$ 10,000.00 $ <br />10,000.00 <br />$ 3,000.00 $ <br />3,000.00 <br />$ 500.00 $ <br />500.00 <br />$ 1,100.00 $ <br />1,100.00 <br />$ 1,000.00 $ <br />1,000.00 <br />$ 500.00 $ <br />500.00 <br />$ 1,150.00 $ <br />1,150.00 <br />Demolition Items <br />3 Remove concrete overflow, sidewalk, and concrete curb SF <br />2,043 <br />$ 1.26 $ <br />2,574.18 <br />$ 1.00 $ <br />2,043.00 <br />$ 1.00 $ <br />2,043.00 <br />$ 4,100.00 $ <br />4,100.00 <br />$ 0.70 $ <br />1,430.10 <br />$ 0.60 $ <br />1,225.80 <br />$ 1.30 $ <br />2,655.90 <br />as noted on Drawings (Sheet 9 of 15) between HCFCD <br />channel and Pecan Crossing Lane <br />4 Remove Wire Fencing LF <br />10 <br />$ 10.00 $ <br />100.00 <br />$ 10.00 $ <br />100.00 <br />$ 1.00 $ <br />10.00 <br />$ 5.00 $ <br />50.00 <br />$ 3.00 $ <br />30.00 <br />$ 25.00 $ <br />250.00 <br />$ 11.50 $ <br />115.00 <br />Path- Items <br />5 5 -Inch Reinforced Concrete Pathway with Single Grade SF <br />14,816 <br />$ 3.50 $ <br />51,856.00 <br />$ 3.20 $ <br />47,411.20 <br />$ 4.45 $ <br />65,931.20 <br />$ 4.95 $ <br />73,339.20 <br />$ 5.60 $ <br />82,969.60 <br />$ 6.00 $ <br />88,896.00 <br />$ 5.60 $ <br />82,969.60 <br />Beam, Poured Monolithic, including Bedding and <br />Associated Site Grading <br />6 5 -Inch Reinforced Concrete Path way with Double Grade SF <br />13,548 <br />$ 3.80 $ <br />51,482.40 <br />$ 3.30 $ <br />44,708.40 <br />$ 4.59 $ <br />62,185.32 <br />$ 5.45 $ <br />73,836.60 <br />$ 8.50 $ <br />115,158.00 <br />$ 7.15 $ <br />96,868.20 <br />$ 6.00 $ <br />81,288.00 <br />Beam, Poured Monolithic, including Bedding and <br />Associated Site Grading <br />7 5 -Inch Reinforced Concrete Pathway, including Bedding SF <br />1,231 <br />$ 3.20 $ <br />3,939.20 <br />$ 3.00 $ <br />3,693.00 <br />$ 4.79 $ <br />5,896.49 <br />$ 4.15 $ <br />5,108.65 <br />$ 6.00 $ <br />7,386.00 <br />$ 5.30 $ <br />6,524.30 <br />$ 5.40 $ <br />6,647.40 <br />and Associated Site Grading <br />8 8 -Inch Reinforced Concrete Pathway, including Bedding SF <br />6,389 <br />$ 4.50 $ <br />28,750.50 <br />$ 3.40 $ <br />21,722.60 <br />$ 5.19 $ <br />33,158.91 <br />$ 6.25 $ <br />39,931.25 <br />$ 7.00 $ <br />44,723.00 <br />$ 7.00 $ <br />44,723.00 <br />$ 6.80 $ <br />43,445.20 <br />and Associated Site Grading <br />9 6 -Inch Reinforced Concrete Pathway with 6 -inch Curbs, SF <br />1,978 <br />$ 4.10 $ <br />8,109.80 <br />$ 3.70 $ <br />7,318.60 <br />$ 5.79 $ <br />11,452.62 <br />$ 6.45 $ <br />12,758.10 <br />$ 5.80 $ <br />11,472.40 <br />$ 8.00 $ <br />15,824.00 <br />$ 6.00 $ <br />11,868.00 <br />including Bedding and Associated Site Grading <br />10 Wheelchair Ramps, Including Bedding and Associated SF <br />398 <br />$ 15.00 $ <br />5,970.00 <br />$ 12.00 $ <br />4,776.00 <br />$ 12.50 $ <br />4,975.00 <br />$ 8.00 $ <br />3,184.00 <br />$ 5.00 $ <br />1,990.00 <br />$ 16.00 $ <br />6,368.00 <br />$ 17.60 $ <br />7,004.80 <br />Grading <br />11 36 -Inch HDPE Culvert LF <br />44 <br />$ 100.00 $ <br />4,400.00 <br />$ 100.00 $ <br />4,400.00 <br />$ 55.00 $ <br />2,420.00 <br />$ 120.00 $ <br />5,280.00 <br />$ 100.00 $ <br />4,400.00 <br />$ 63.00 $ <br />2,772.00 <br />$ 70.70 $ <br />3,110.80 <br />12 Safety End Treatment EA <br />2 <br />$ 1,500.00 $ <br />3,000.00 <br />$ 500.00 $ <br />1,000.00 <br />$ 1,750.00 $ <br />3,500.00 <br />$ 2,600.00 $ <br />5,200.00 <br />$ 1,300.00 $ <br />2,600.00 <br />$ 1,500.00 $ <br />3,000.00 <br />$ 2,295.50 $ <br />4,591.00 <br />13 Prefabricated Pedestrian Bridge LS <br />1 <br />$ 126,195.00 $ <br />126,195.00 <br />$ 254,096.00 $ <br />254,096.00 <br />$ 240,000.00 $ <br />240,000.00 <br />$ 215,000.00 $ <br />215,000.00 <br />$ 190,000.00 $ <br />190,000.00 <br />$ 237,000.00 $ <br />237,000.00 <br />$ 230,000.00 $ <br />230,000.00 <br />14 4" Concrete Filled Steel Bollard LF <br />4 <br />$ 350.00 $ <br />1,400.00 <br />$ 250.00 $ <br />1,000.00 <br />$ 225.00 $ <br />900.00 <br />$ 300.00 $ <br />1,200.00 <br />$ 500.00 $ <br />2,000.00 <br />$ 350.00 $ <br />1,400.00 <br />$ 460.00 $ <br />1,840.00 <br />15 Backslope Interceptor Structure including Connection to LS <br />1 <br />$ 1,950.00 $ <br />1,950.00 <br />$ 4,000.00 $ <br />4,000.00 <br />$ 1,200.00 $ <br />1,200.00 <br />$ 2,100.00 $ <br />2,100.00 <br />$ 1,000.00 $ <br />1,000.00 <br />$ 2,300.00 $ <br />2,300.00 <br />$ 4,458.60 $ <br />4,458.60 <br />Proposed Trail <br />16 30 -inch CMP Outfall Pipe LF <br />55 <br />$ 100.00 $ <br />5,500.00 <br />$ 120.00 $ <br />6,600.00 <br />$ 55.00 $ <br />3,025.00 <br />$ 95.00 $ <br />5,225.00 <br />$ 150.00 $ <br />8,250.00 <br />$ 80.00 $ <br />4,400.00 <br />$ 62.30 $ <br />3,426.50 <br />17 Regrading of Slopes, As Required for Sidewalk LS <br />1 <br />$ 15,000.00 $ <br />15,000.00 <br />$ 3,000.00 $ <br />3,000.00 <br />$ 2,500.00 $ <br />2,500.00 <br />$ 4,250.00 $ <br />4,250.00 <br />$ 4,400.00 $ <br />4,400.00 <br />$ 2,000.00 $ <br />2,000.00 <br />$ 6,755.10 $ <br />6,755.10 <br />Construction <br />18 Inlet Protection Barriers EA <br />5 <br />$ 126.00 $ <br />630.00 <br />$ 100.00 $ <br />500.00 <br />$ 5.00 $ <br />25.00 <br />$ 70.00 $ <br />350.00 <br />$ 60.00 $ <br />300.00 <br />$ 50.00 $ <br />250.00 <br />$ 46.00 $ <br />230.00 <br />19 Reinforced Filter Fabric Fencing LF <br />875 <br />$ 1.26 $ <br />1,102.50 <br />$ 4.00 $ <br />3,500.00 <br />$ 2.00 $ <br />1,750.00 <br />$ 1.30 $ <br />1,137.50 <br />$ 1.40 $ <br />1,225.00 <br />$ 2.50 $ <br />2,187.50 <br />$ 1.70 $ <br />1,487.50 <br />20 Block Sodding of Disturbed Turf, per Plans and /or as SF <br />100 <br />$ 2.60 $ <br />260.00 <br />$ 3.00 $ <br />300.00 <br />$ 0.40 $ <br />40.00 <br />$ 1.00 $ <br />100.00 <br />$ 1.00 $ <br />100.00 <br />$ 4.75 $ <br />475.00 <br />$ 5.80 $ <br />580.00 <br />Directed by ENGINEER <br />21 Hydromulch Seeding AC <br />1 <br />$ 1,500.00 $ <br />1,500.00 <br />$ 1,700.00 $ <br />1,700.00 <br />$ 1,500.00 $ <br />1,500.00 <br />$ 1,850.00 $ <br />1,850.00 <br />$ 1,275.49 $ <br />1,275.49 <br />$ 1,750.00 $ <br />1,750.00 <br />$ 1,725.00 $ <br />1,725.00 <br />22 6 -foot Chain Link Fencing LF <br />170 <br />$ 26.00 $ <br />4,420.00 <br />$ 18.00 $ <br />3,060.00 <br />$ 24.35 $ <br />4,139.50 <br />$ 20.00 $ <br />3,400.00 <br />$ 17.00 $ <br />2,890.00 <br />$ 22.00 $ <br />3,740.00 <br />$ 28.80 $ <br />4,896.00 <br />TOTAL BIDAMOUNT <br />$ 354,139.58 <br />$ 442,928.80 <br />$ 449,152.04 <br />$ 465,200.30 <br />$ 539,599.59 <br />$ 543,453.80 <br />$ 566,244.40 <br />