BID TABULATION #11024
<br />PECAN PARK PEDESTRIAN TRAILS
<br />AUGUST 2, 2011
<br />DESCRIPTION QTY
<br />UOM
<br />RW Lucas Construction
<br />Unit Price Total Amt. Bid
<br />GW Phillips Concrete
<br />Construction
<br />Unit Price
<br />Total Amt. Bid
<br />Brooks Concrete
<br />Unit Price Total Amt. Bid
<br />D.L. Meacham
<br />Unit Price
<br />Total Amt. Bid
<br />Jerdon Enterprise
<br />Unit Price Total Amt. Bid
<br />AAA Asphalt & Paving
<br />Unit Price Total Amt. Bid
<br />MAR -CON Services
<br />Unit Price
<br />Total Amt. Bid
<br />Site Pr,P &Mobilization
<br />1 Site Preparation, to include Mobilization, Cleanup and LS
<br />1
<br />$ 26,000.00 $
<br />26,000.00
<br />$ 25,000.00 $
<br />25,000.00
<br />$ 2,000.00 $
<br />2,000.00
<br />$ 6,700.00 $
<br />6,700.00
<br />$ 55,000.00 $
<br />55,000.00
<br />$ 21,000.00 $
<br />21,000.00
<br />$ 66,000.00 $
<br />66,000.00
<br />Demobilization
<br />2 Traffic Control and Regulation LS
<br />1
<br />$ 10,000.00 $
<br />10,000.00
<br />$ 3,000.00 $
<br />3,000.00
<br />$ 500.00 $
<br />500.00
<br />$ 1,100.00 $
<br />1,100.00
<br />$ 1,000.00 $
<br />1,000.00
<br />$ 500.00 $
<br />500.00
<br />$ 1,150.00 $
<br />1,150.00
<br />Demolition Items
<br />3 Remove concrete overflow, sidewalk, and concrete curb SF
<br />2,043
<br />$ 1.26 $
<br />2,574.18
<br />$ 1.00 $
<br />2,043.00
<br />$ 1.00 $
<br />2,043.00
<br />$ 4,100.00 $
<br />4,100.00
<br />$ 0.70 $
<br />1,430.10
<br />$ 0.60 $
<br />1,225.80
<br />$ 1.30 $
<br />2,655.90
<br />as noted on Drawings (Sheet 9 of 15) between HCFCD
<br />channel and Pecan Crossing Lane
<br />4 Remove Wire Fencing LF
<br />10
<br />$ 10.00 $
<br />100.00
<br />$ 10.00 $
<br />100.00
<br />$ 1.00 $
<br />10.00
<br />$ 5.00 $
<br />50.00
<br />$ 3.00 $
<br />30.00
<br />$ 25.00 $
<br />250.00
<br />$ 11.50 $
<br />115.00
<br />Path- Items
<br />5 5 -Inch Reinforced Concrete Pathway with Single Grade SF
<br />14,816
<br />$ 3.50 $
<br />51,856.00
<br />$ 3.20 $
<br />47,411.20
<br />$ 4.45 $
<br />65,931.20
<br />$ 4.95 $
<br />73,339.20
<br />$ 5.60 $
<br />82,969.60
<br />$ 6.00 $
<br />88,896.00
<br />$ 5.60 $
<br />82,969.60
<br />Beam, Poured Monolithic, including Bedding and
<br />Associated Site Grading
<br />6 5 -Inch Reinforced Concrete Path way with Double Grade SF
<br />13,548
<br />$ 3.80 $
<br />51,482.40
<br />$ 3.30 $
<br />44,708.40
<br />$ 4.59 $
<br />62,185.32
<br />$ 5.45 $
<br />73,836.60
<br />$ 8.50 $
<br />115,158.00
<br />$ 7.15 $
<br />96,868.20
<br />$ 6.00 $
<br />81,288.00
<br />Beam, Poured Monolithic, including Bedding and
<br />Associated Site Grading
<br />7 5 -Inch Reinforced Concrete Pathway, including Bedding SF
<br />1,231
<br />$ 3.20 $
<br />3,939.20
<br />$ 3.00 $
<br />3,693.00
<br />$ 4.79 $
<br />5,896.49
<br />$ 4.15 $
<br />5,108.65
<br />$ 6.00 $
<br />7,386.00
<br />$ 5.30 $
<br />6,524.30
<br />$ 5.40 $
<br />6,647.40
<br />and Associated Site Grading
<br />8 8 -Inch Reinforced Concrete Pathway, including Bedding SF
<br />6,389
<br />$ 4.50 $
<br />28,750.50
<br />$ 3.40 $
<br />21,722.60
<br />$ 5.19 $
<br />33,158.91
<br />$ 6.25 $
<br />39,931.25
<br />$ 7.00 $
<br />44,723.00
<br />$ 7.00 $
<br />44,723.00
<br />$ 6.80 $
<br />43,445.20
<br />and Associated Site Grading
<br />9 6 -Inch Reinforced Concrete Pathway with 6 -inch Curbs, SF
<br />1,978
<br />$ 4.10 $
<br />8,109.80
<br />$ 3.70 $
<br />7,318.60
<br />$ 5.79 $
<br />11,452.62
<br />$ 6.45 $
<br />12,758.10
<br />$ 5.80 $
<br />11,472.40
<br />$ 8.00 $
<br />15,824.00
<br />$ 6.00 $
<br />11,868.00
<br />including Bedding and Associated Site Grading
<br />10 Wheelchair Ramps, Including Bedding and Associated SF
<br />398
<br />$ 15.00 $
<br />5,970.00
<br />$ 12.00 $
<br />4,776.00
<br />$ 12.50 $
<br />4,975.00
<br />$ 8.00 $
<br />3,184.00
<br />$ 5.00 $
<br />1,990.00
<br />$ 16.00 $
<br />6,368.00
<br />$ 17.60 $
<br />7,004.80
<br />Grading
<br />11 36 -Inch HDPE Culvert LF
<br />44
<br />$ 100.00 $
<br />4,400.00
<br />$ 100.00 $
<br />4,400.00
<br />$ 55.00 $
<br />2,420.00
<br />$ 120.00 $
<br />5,280.00
<br />$ 100.00 $
<br />4,400.00
<br />$ 63.00 $
<br />2,772.00
<br />$ 70.70 $
<br />3,110.80
<br />12 Safety End Treatment EA
<br />2
<br />$ 1,500.00 $
<br />3,000.00
<br />$ 500.00 $
<br />1,000.00
<br />$ 1,750.00 $
<br />3,500.00
<br />$ 2,600.00 $
<br />5,200.00
<br />$ 1,300.00 $
<br />2,600.00
<br />$ 1,500.00 $
<br />3,000.00
<br />$ 2,295.50 $
<br />4,591.00
<br />13 Prefabricated Pedestrian Bridge LS
<br />1
<br />$ 126,195.00 $
<br />126,195.00
<br />$ 254,096.00 $
<br />254,096.00
<br />$ 240,000.00 $
<br />240,000.00
<br />$ 215,000.00 $
<br />215,000.00
<br />$ 190,000.00 $
<br />190,000.00
<br />$ 237,000.00 $
<br />237,000.00
<br />$ 230,000.00 $
<br />230,000.00
<br />14 4" Concrete Filled Steel Bollard LF
<br />4
<br />$ 350.00 $
<br />1,400.00
<br />$ 250.00 $
<br />1,000.00
<br />$ 225.00 $
<br />900.00
<br />$ 300.00 $
<br />1,200.00
<br />$ 500.00 $
<br />2,000.00
<br />$ 350.00 $
<br />1,400.00
<br />$ 460.00 $
<br />1,840.00
<br />15 Backslope Interceptor Structure including Connection to LS
<br />1
<br />$ 1,950.00 $
<br />1,950.00
<br />$ 4,000.00 $
<br />4,000.00
<br />$ 1,200.00 $
<br />1,200.00
<br />$ 2,100.00 $
<br />2,100.00
<br />$ 1,000.00 $
<br />1,000.00
<br />$ 2,300.00 $
<br />2,300.00
<br />$ 4,458.60 $
<br />4,458.60
<br />Proposed Trail
<br />16 30 -inch CMP Outfall Pipe LF
<br />55
<br />$ 100.00 $
<br />5,500.00
<br />$ 120.00 $
<br />6,600.00
<br />$ 55.00 $
<br />3,025.00
<br />$ 95.00 $
<br />5,225.00
<br />$ 150.00 $
<br />8,250.00
<br />$ 80.00 $
<br />4,400.00
<br />$ 62.30 $
<br />3,426.50
<br />17 Regrading of Slopes, As Required for Sidewalk LS
<br />1
<br />$ 15,000.00 $
<br />15,000.00
<br />$ 3,000.00 $
<br />3,000.00
<br />$ 2,500.00 $
<br />2,500.00
<br />$ 4,250.00 $
<br />4,250.00
<br />$ 4,400.00 $
<br />4,400.00
<br />$ 2,000.00 $
<br />2,000.00
<br />$ 6,755.10 $
<br />6,755.10
<br />Construction
<br />18 Inlet Protection Barriers EA
<br />5
<br />$ 126.00 $
<br />630.00
<br />$ 100.00 $
<br />500.00
<br />$ 5.00 $
<br />25.00
<br />$ 70.00 $
<br />350.00
<br />$ 60.00 $
<br />300.00
<br />$ 50.00 $
<br />250.00
<br />$ 46.00 $
<br />230.00
<br />19 Reinforced Filter Fabric Fencing LF
<br />875
<br />$ 1.26 $
<br />1,102.50
<br />$ 4.00 $
<br />3,500.00
<br />$ 2.00 $
<br />1,750.00
<br />$ 1.30 $
<br />1,137.50
<br />$ 1.40 $
<br />1,225.00
<br />$ 2.50 $
<br />2,187.50
<br />$ 1.70 $
<br />1,487.50
<br />20 Block Sodding of Disturbed Turf, per Plans and /or as SF
<br />100
<br />$ 2.60 $
<br />260.00
<br />$ 3.00 $
<br />300.00
<br />$ 0.40 $
<br />40.00
<br />$ 1.00 $
<br />100.00
<br />$ 1.00 $
<br />100.00
<br />$ 4.75 $
<br />475.00
<br />$ 5.80 $
<br />580.00
<br />Directed by ENGINEER
<br />21 Hydromulch Seeding AC
<br />1
<br />$ 1,500.00 $
<br />1,500.00
<br />$ 1,700.00 $
<br />1,700.00
<br />$ 1,500.00 $
<br />1,500.00
<br />$ 1,850.00 $
<br />1,850.00
<br />$ 1,275.49 $
<br />1,275.49
<br />$ 1,750.00 $
<br />1,750.00
<br />$ 1,725.00 $
<br />1,725.00
<br />22 6 -foot Chain Link Fencing LF
<br />170
<br />$ 26.00 $
<br />4,420.00
<br />$ 18.00 $
<br />3,060.00
<br />$ 24.35 $
<br />4,139.50
<br />$ 20.00 $
<br />3,400.00
<br />$ 17.00 $
<br />2,890.00
<br />$ 22.00 $
<br />3,740.00
<br />$ 28.80 $
<br />4,896.00
<br />TOTAL BIDAMOUNT
<br />$ 354,139.58
<br />$ 442,928.80
<br />$ 449,152.04
<br />$ 465,200.30
<br />$ 539,599.59
<br />$ 543,453.80
<br />$ 566,244.40
<br />
|