Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: September 12, 2011 <br />Requested By: Julian Garza <br />Department: Planning <br />Report: X Resolution: _Ordinance: <br />Exhibit: Proposal for Engineering Services for <br />Battleground Estates Proposed Improvements <br />Exhibit: Exhibit of Proposed Improvements for <br />Battleground Estates <br />Exhibit: Proposal for Engineering Services for <br />Shade River Proposed Improvements <br />Exhibit: Exhibit of Proposed Improvements for <br />Shade River <br />Appropriation <br />Source of Funds GEN 957 <br />Account Number: 050 -9892- 957 -1100 <br />Amount Budgeted: S224,220.00 <br />Amount Requested: S224,220.00 <br />Budgeted Item: X YES NO <br />SUMMARY <br />On August 4, 2011 Staff presented to the Drainage Committee Proposals for Engineering Services as <br />authorized by City Council on Mav 23, 2011, for Preliminaiv Engineering Design of Battleground Estates <br />and Shady* River. The Drainage Committee authorized Staff to present these proposals to City Council <br />for approval. <br />Preliminaiv En ing eering Design of Battleground Estates: <br />This report will evaluate and determine what improvements are needed to reduce the structural flooding <br />within Battleground Estates. This work effort will be a two phase approach with the first phase <br />evaluating the restricted culverts at North P Street and the F101 -00 -00 channel and the second phase <br />evaluating the local drainage element within the Battleground Estates and the downstream channels. Staff <br />will present the results of phase 1 and request authorization before proceeding with phase two. The scope <br />of work includes all elements necessaiv for design including Geotechnical Investigation, Environmental <br />Study* and Surveving. <br />Preliminaiv Engineering Design for Shadv River (Taylor Bavou, HCFC Unit A- 104- 00 -00) <br />This report will include updating the watershed hydrology to include new residential and commercial <br />development in the upper Taylor bayou watershed, develop a hydraulic model for the channel from its <br />study* limits to SH 146, determine the limits and size of the proposed channel improvements to <br />hydraulically convey* the 100 year design storm within the channel banks and locate and hydraulically <br />size a mitigation pond volume and control structure to mitigate impacts from the proposed channel <br />improvements. This work will be phased by task to avoid unnecessaiv engineering design if the <br />hydrologic analysis concludes that channel improvements are not needed. The scope of work does not <br />include the necessaiv design elements including detailed survey* information, Geotechnical Investigation <br />and Environmental Study* due to the nature of the scope. <br />