Laserfiche WebLink
Project Benefits, Liabilities and Annual Operation Cost <br />The City Wide Drainage Report identified F101 -00 -00 in Battleground Estates and Taylor Bayou in <br />Shadv River as the potential cause of structural flooding. The preliminaiv engineering reports will <br />evaluate the channels to determine what improvements are needed to reduce structural flooding in these <br />areas. There are no annual operating costs associated with these projects at this time. <br />Action Required by Council: <br />Authorize the City Manager to execute a contract with Klotz Associates, Inc. for the Preliminaiv <br />Engineering Design of Battleground Estates in the amount of $166,420.00 and with Civil Tech Engineering <br />for the Preliminaiv Engineering Design of Shady River (Taylor Bayou, HCFCD Unit A- 104- 00 -00) in the <br />amount of $57,800.00 for a total authorized amount of $224,220.00. <br />Approved for City Council Agenda <br />Ron Bottoms, City Manager Date <br />