My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-12-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2011
>
09-12-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2011 12:07:15 PM
Creation date
7/25/2025 3:10:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
9/12/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Benefits, Liabilities and Annual Operation Cost <br />The City Wide Drainage Report identified F101 -00 -00 in Battleground Estates and Taylor Bayou in <br />Shadv River as the potential cause of structural flooding. The preliminaiv engineering reports will <br />evaluate the channels to determine what improvements are needed to reduce structural flooding in these <br />areas. There are no annual operating costs associated with these projects at this time. <br />Action Required by Council: <br />Authorize the City Manager to execute a contract with Klotz Associates, Inc. for the Preliminaiv <br />Engineering Design of Battleground Estates in the amount of $166,420.00 and with Civil Tech Engineering <br />for the Preliminaiv Engineering Design of Shady River (Taylor Bayou, HCFCD Unit A- 104- 00 -00) in the <br />amount of $57,800.00 for a total authorized amount of $224,220.00. <br />Approved for City Council Agenda <br />Ron Bottoms, City Manager Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.