My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-12-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2011
>
09-12-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2011 12:07:15 PM
Creation date
7/25/2025 3:10:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
9/12/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
kIotz 0 1 ,10 associates <br />Mr. Julian Garza Jr., P.E. <br />July 5, 2011 <br />Page 2 of 7 <br />recommendations and to develop cost for those recommendations. We understand that the <br />City has approximately $900K of construction funds to improve the drainage in the <br />Battleground Estates area. <br />Klotz Associates will develop a Preliminary Engineering Report including supporting <br />hydrologic and hydraulic calculations to submit to the City of La Porte and eventually to <br />Harris County and Harris County Flood Control District (HCFCD) to reflect the alternatives <br />evaluated and proposed improvements to the channels. <br />The goal of this effort is to evaluate and determine what improvements are needed to reduce <br />the structural flooding within the Battleground Estates area, It is planned that this work effort <br />will be a two phase approach with the first phase evaluating the restricted culverts at North P <br />Street and F101 -00 -00 and the second phase evaluating the local drainage elements within <br />Battleground Estates and the downstream channels. Listed below are the details of the scope. <br />Surveying is anticipated and is included in this scope of work. The results of the surveying <br />will to allow us to extend the hydraulic model further upstream into the Battleground Estates <br />area by picking up channel sizes, flow lines, culvert sizes, location and flow lines and some <br />representative slab elevations. <br />Soils evaluations are anticipated and are included with this scope of services. The soils <br />evaluation will evaluate the soil conditions and to include the results of the soils evaluation <br />into the recommended projects. <br />Environmental investigation are anticipated and are included with this scope of services. The <br />environmental evaluation will evaluate the local area and the results of the environmental <br />investigation will be utilized in the development of the recommended projects. <br />SCOPE OF SERVICES <br />Task #1- Kick off weetin <br />1. Kickoff meeting with staff to discuss goals /objectives for the plan. <br />Task #2 — Evaluation of restricted culverts at North P Street and F101 and issue letter <br />U ort <br />l . Conduct field measurements to get a generalized location, size of culvert and <br />approximate depth of each of the culverts located at the intersection of North P Street and <br />F l o I -00 -00 channel. <br />2. Have a meeting with Harris County to discuss the overall effort and to understand any <br />improvements or plans that they may have that could impact the drainage in the <br />Battleground Estates area specifically North P Street. <br />
The URL can be used to link to this page
Your browser does not support the video tag.