My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-12-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2011
>
09-12-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2011 12:07:15 PM
Creation date
7/25/2025 3:10:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
9/12/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
kIotz,9associates <br />Mr. Julian Garza Jr., P.E. <br />July 5, 2011 <br />Page 3 of 7 <br />3. Prepare an approximate evaluation of this location using either the RAS software or <br />normal depth analysis to evaluate the existing culverts and to determine the benefits and <br />impacts of upsizing or replacing the culverts with larger.culverts. Prepare the evaluation <br />for the 10, 50 and 100 -year flow conditions. <br />4. Prepare a letter report (including text, tables, construction cost estimate and a few <br />exhibits) and submit the report to staff. Incorporate applicable comments received from <br />staff to the letter report. Submit a final report to staff. <br />5. Present the results to the Flooding and Drainage Committee, <br />Stop work until receiving written direction from the Ci to proceed with the folloNvin <br />tasks. The purpose of the stop working task is based on the assumption that improving the <br />restriction in the culverts at North P Street could provide significant improvements to the <br />Battleground Estates area and that additional analysis or improvements are deemed not <br />needed at this time. <br />Task #3 - Data Collection and authorize sub - consultants to begin their work: <br />1. Conduct field reconnaissance. <br />2, Review available repetitive loss data from FEMA or others for us in the plan. <br />3. Run LIDAR for the City to develop one foot contour lines. <br />4. Identify potential ponding areas from a review of the LIDAR data and from a ponding <br />evaluation. <br />5. Obtain and review the latest available hydrologic and hydraulic models, reports, plans <br />and other helpful data from HCFCD, Harris County, City staff, or from others. <br />6. Identify problem areas on a map of the City that include: structural flooding, areas of <br />restriction, areas of significant ponding and other areas where drainage problems occur or <br />may occur due to future development potential. <br />7. Have a meeting with Harris County Flood Control District to discuss the overall effort <br />and to understand any improvements or plans that they may have that could impact the <br />drainage in the Battleground Estates area. <br />8. Identify a criteria or goal that will be used in determining what is an acceptable goal or <br />solution to the identified problem areas. The criteria may indicate a need to maintain or <br />reduce flows within the area or it may indicate a need to maintain or reduce water surface <br />elevations within an area or the criteria may identify other controlling issues. <br />9. Use available LIDAR data for the area to develop contributing drainage area and current <br />information on local issues. <br />10. Use our aerials or aerial information from the City. <br />11. Work with the City of La Porte staff to understand current development trends and their <br />future plans for the area. <br />12. Identify areas that may creed updating or additional consideration from the hydrologic or <br />hydraulic models. <br />
The URL can be used to link to this page
Your browser does not support the video tag.