My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-12-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2011
>
09-12-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2011 12:07:15 PM
Creation date
7/25/2025 3:10:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
9/12/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cost Estimate for Geotechnical Engineering Services Irerracon <br />Drainage Ditch Improvements— Battleground Estates a La Porte, Texas <br />July 5, 2011 n Terracon Document fro. P91110112 <br />Page 2 <br />B. SCOPE OF SERVICES <br />A brief summary of the services to be provided by Terracon is presented in the following <br />paragraphs. <br />Field Program, The field program is planned to consist of drilling six (6) test borings to depths of <br />20 feet below existing grade along the proposed drainage ditch improvements, and two test borings <br />to depths of 10 feet below existing grade (top of paving) for the roadside ditches along <br />Bois D`Arc Drive. The total drilling footage is planned to be 140 feet. <br />Soil samples will generally be collected utilizing either open -tube samplers or Standard Penetration <br />Test, Once the samples have been collected and classified in the field, they will be properly <br />prepared and placed in appropriate sample containers for transport to our laboratory. We can locate <br />the borings by measuring distances from existing streets and /or site features shown on the provided <br />drawings, without the use of survey equipment. Boring depths will be measured from existing grade. <br />The boring locations will be backfilled with soil cuttings and patched with asphaltic concrete (where <br />needed). <br />The drilling services for this project will be performed by a drilling subcontractor or Terracon`s in- <br />house drillers. We plan to use all- terrain vehicle (ATV)- mounted drilling equipment to access the <br />boring locations. This scope of services assumes that the site can be accessed during normal <br />business hours and does not include services associated with site clearing, location of on -site <br />underground utilities, or the use of special equipment for unusually soft or wet surface conditions. If <br />such conditions are known to exist on the site, Terracon should be notified so that we may adjust <br />our scope of services and estimated fees, if necessary. <br />Terracon will notify DIG TESS, a free utility locating service, to help locate public utilities within the <br />vicinity of the site. If underground utilities are known to exist within the site, Terracon should be <br />notified so that we may review utility plans and help avoid the existing lines. Terracon cannot be <br />responsible for damage to unmarked and/or unlocated utilities for which we are unaware orthat are <br />improperly located. <br />Laboratory Testin The sample classifications will be reviewed and a laboratory testing program <br />will be assigned which will be specific to the project requirements and the subsurface conditions <br />observed, The testing program could include, but may not be limited to, moisture contents, unit dry <br />weights, Atterberg limits, compressive strength tests and grain -size analyses. In addition, we plan to <br />include crumb tests, pinhole dispersion tests, and consolidated undrained triaxial tests in <br />accordance with HCPCD requirements. <br />Reliable n Responsive Q Corivottieltt o Innovative <br />
The URL can be used to link to this page
Your browser does not support the video tag.