My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-12-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2011
>
09-12-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2011 12:07:15 PM
Creation date
7/25/2025 3:10:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
9/12/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cost Estimate for Geotechnical Engineering Services rr <br />Drainage Ditch Improvements — Battleground Estates m La Porte, Texas <br />July 5, 2011 m Terracon Document No. P91110112 <br />Page 3 <br />Geotechnical Engineering Report. The project will be supervised by a professional Geotechnical <br />Engineer licensed in the State of Texas. Based on the results of our evaluation, an engineering <br />report will be prepared which details the results of the testing performed and provides Boring Logs <br />and a Boring Location Plan. The report will also provide Geotechnical Engineering <br />recommendations which will address the following: <br />Groundwater Control; <br />Excavation and sideslope considerations; and <br />Erosion protection considerations. <br />Slope stability analysis will be performed using short -term, long -term, and rapid drawdown <br />conditions in accordance with HCFCD requirements. We request that the client provide all <br />applicable cross - sections and any other data relevant to the slope stability analysis. <br />Schedule. We can initiate our field operations within three to five working days following <br />authorization to proceed, if site access and weather conditions will permit. We anticipate completion <br />Of our services and submittal of our final report within about five weeks after completion of our field <br />services. In situations where information is needed prior to submittal of our report, we can provide <br />verbal information or recommendations for specific project requirements directly after we have <br />completed our field and laboratory programs. <br />C. COMPENSATION <br />For the scope of worst consisting of drilling footage of 140 feet, laboratory testing, and a report as <br />outlined in this document, we estimate the following total costs. The estimated costs are presented <br />in detail on the attached details of cost estimate. <br />Task <br />Cost Estimate <br />Field Services <br />$5,453.00 <br />Laboratory Testing <br />$5,281.00 <br />Engineering Analysis & Reporting <br />$4,950.00 <br />Total Estimated Cost <br />$15,684.00 <br />The cost of our services for requested effort will not exceed this estimate unless the scope of <br />services is modified with the approval of the client. <br />Additional consultation (such as attendance on project meetings, conference calls, engineering <br />analyses, review of project documents, etc.) requested will be performed on a time - and - material <br />basis. The fee to provide additional consultation services will be invoiced in accordance with the <br />Roliahle-n Responsive n Convoniolit n 111110vativO <br />
The URL can be used to link to this page
Your browser does not support the video tag.