Laserfiche WebLink
2 <br />4.Any and all construction materials utilized by the pipeline contractor for access across <br />any and all drainage ditches, drainage paths and/or drainage channels shall be promptly <br />removed by the contractor upon completion of construction at each crossing. <br />5.Any fill material resulting from construction shall be removed or be subject to a Fill <br />Permit from the City. <br />6.Prior to an anticipated major rain event, contractor shall remove all construction-related <br />materials and/orfill from any drainage way or roadside ditch as to not impede storm <br />water runoff. <br />Upon Council’s approval, the Director of Planning will execute aconstruction permit to HSC <br />Pipeline Partnership, LLC induplicate originals, one which shall be delivered to the Permittee and <br />one which shall be retained by the City, as required by ordinance. <br />__________________________________________________________________________________________________________________ <br />Action Required by Council: <br />Authorizethe Planning Director to execute a Pipeline Permit to HSC Pipeline Partnership, LLCfor <br />the installation ofa20”NGLpipelinethrough the City of La Porte. <br />______________________________________________________________________________________ <br />Approved for City Council Agenda <br />Steve Gillett,InterimCity ManagerDate <br /> <br />