My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-09-12 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2012
>
04-09-12 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2012 5:06:43 PM
Creation date
7/25/2025 3:11:38 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/9/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Funds Budgeted <br />: <br />003-9890-631.11UTL 631 Lift Station # 6 $382,447 <br />045-9890-631.11Lift Station #6 $ 28,610 available($ 67,553 budgeted) <br />Total Budgeted: $411,057 available <br />($450,000 budgeted) <br />Funds Previously Encumbered: <br />$ 17,585 <br />HDR Claunch & Miller–(Design/Construction Services) <br />Funds Remaining: $393,472 <br />Funds Requested: <br />Base Construction Bid$435,550 <br />Construction Cost Contingency$13,000 <br />Total Request:$448,550 <br />Recommendation to Fund Shortfall: <br />$55,078 <br />UTL 613 –Lift Station #37 (from proj.cost under-run) (Approx. $58,000 available) <br />Project Benefits, Liabilities, and Operating Cost: <br />Benefits: <br />The reliability of the wastewater system will be improved, and the work proposed with this <br />contract will reduce the possibility of sewage overflow as theresult of equipment failure that <br />would be ahealth and environmental hazard. <br />The proposed lift station includes additional capacity for future development in the South La <br />Porte Area. <br />Liabilities of Maintaining the Status Quo: <br />Increased potential forsewer overflows resulting in negative health and environmental <br />impact. <br />Operating Costs: <br />Reduced. The project will result in significantly lower potential emergency repairs and <br />maintenance due to equipment failure <br />New submersible pumps have a more efficient pumping capacity compared to the suction lift <br />pumps that are in the old lift station resulting in less electricity required for gallons pumped. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.