My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-25-13 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2013
>
03-25-13 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2013 9:34:22 AM
Creation date
7/25/2025 3:14:08 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
3/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: March 25, 2013 Appropriation <br />Requested By: Stephen L. Barr Source of Funds: Fund 015 <br />Department: Parks & Recreation Acc’t Number: 015-9892-647-1100 <br /> Fund15 Contingency <br />_X__Resolution: _____Ordinance: ____ Amount Budgeted: $158,818 <br />Report: <br />Exhibits: Engineer’s Report & Cost Estimate Amount Requested: $192,500 <br />Exhibits: NoBid Response by Vendors Budgeted Item: YES X NO <br />Exhibits: Bidder’s List <br />_______ <br />Exhibits:Bid Tabulation <br />______________________________________________________________________________ <br />SUMMARY & RECOMMENDATION <br />The Wave Pool Mechanical Room is in need of extensive concrete and electrical repairs and re-fits <br />to bring it into an operational condition for the upcoming swim season. The project was budgeted in <br />this year’s capital improvement fund. After the initial assessmentby our Engineering firm, <br />additional problem areas were discovered and the estimated cost of repairs was submitted for <br />review.In January, staff requested additional funding and the City Council approved, based on the <br />Engineering Report and the estimated cost of repairs that was provided at that time. <br />The project was let for bids in February, withfifteencontractors invited to bid, of which many <br />th <br />attended thepre-bid conference. The bids were opened on March 12and two bids were received. <br />One bid was submitted for performing theelectricalcomponentonly; the secondbid was submitted <br />Aztec Remodeling and Landscaping, Inc. <br />for the complete projectbyin the amount of $175,000. <br />Prospective bidders were polled by the Purchasing Department as to why they had not bid the <br />project. The most prevalent answers were, “time constraints”, “bonding capacity”,and “too busy” <br />Aztec Remodeling and Landscaping, Inc. <br />(see attached NoBid Response).has performed work <br />for the City in the past, and is currently constructing the satellite restroom facilities at Pecan Park for <br />the City. The contractor has performed wellfor the Cityon both past and present projects. <br />The amended project budgetis $158,818, includingthe proposed contract and contingency amount, <br />based on the Engineer’s estimated cost. The shortfall between the actual bid received and the budget <br />is $16,182. The consulting engineeris recommending that a 10% contingency be allocated as well <br />to be able to address any hidden problem areas that may not have been identified in the initial <br />project assessment.Funds are available in the Capital Improvement contingency account in the <br />amount of $33,682, to cover the budget shortfall and contingency. <br />There is a second option to consider regarding this project. Because of the two rather large <br />construction projects that were let at the same time, contractors may have “hung their hat” on the <br />larger projects at the expense of this one. It is possible to rebid the project with the hope of attracting <br />additional contractors that may fit within our existing budget for this project. The drawback is that if <br />rebid, the renovation will not be completed prior to the pool opening, currently scheduled for <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.