My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-25-13 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2013
>
03-25-13 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2013 9:34:22 AM
Creation date
7/25/2025 3:14:08 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
3/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
th <br />Memorial Day Weekend (May 25-27). Rebid will most likely delay the opening by a month or <br />th <br />so, which would mean that the pool would open around June 15. <br />A third option would be to operate the Wave Pool “as is” for another complete season. The <br />engineering consultant, as well as theCity Engineer, do not recommend this option as the condition <br />of the structure under operation, is consideredto betoo dangerous. <br />Staff is seeking direction from the City Council regarding the three proposed options: <br />Aztec Remodeling and Landscaping, Inc. <br />A.Recommend awardof the project to in the <br />amount of $175,000 with 10% contingency funding in the event there are as yet unidentified <br />problems with the structure, and appropriating availablefunding from the Capital <br />th <br />Improvement Contingency account, with projected completion on May 15. <br />B.Recommend rebid of project to attract additional contractors and possibly bring the project <br />th <br />back within budget,with projected completion around June 15. <br />C.Staff does not recommend Option 3, to operate the Wave Pool “as is”. <br /> <br />Action Required by Council: <br />A.Consider approval or other action awardingthe Wave Pool Mechanical Building <br />Aztec Remodeling and Landscaping, Inc. <br />Renovation to in the amount of $175,000 with <br />10% contingency funding for a total of $192,500, and appropriating available funds from the <br />Capital Improvement Contingency account; or <br />B.Consider rejecting current bids and rebid of project to attract additional contractors in hopes <br />th <br />of more favorable bids, with projected completion around June 15; or <br />C.Consider operation of the Wave Pool “as is”. <br /> <br />______________________________________________________________________________ <br />Approved for City Council Agenda <br />___________________________________________________________ <br />Corby D. Alexander,CityManager Date <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.