Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: April 13, 2013 <br />Requested By: Stephen Barr <br />Department: Administration <br />Report: Resolution: Ordinance: <br />Exhibits: Draft RFP for Design Build of Electrical Proiect <br />Budget <br />Source of Funds: <br />Account Number: <br />Amount Budgeted: <br />Amount Requested: <br />Budgeted Item: YES NO <br />SUMMARY & RECOMMENDATION <br />This item has been placed on the agenda at the request of Councilman Moser. <br />In the past generators have been rented for events on Main Street such as the popular Christmas <br />on Main Street. The generators are noisy and disrupt the festivities, such as choir performances, <br />etc. The generators are often inadequate to provide sufficient power to vendors and provide <br />lighting for the events. The funds here are earmarked to design and install a semi -permanent <br />electrical system that can meet the needs of future Main Street events, and can also be used for <br />other events at various locations throughout the city. This project will be funded by a $145,000 <br />Hotel/Motel transfer. <br />Proiect Timeline <br />July, 2012 — Staff met with CenterPoint representative to gather input to initialize a conceptual <br />plan to meet the needs listed above. <br />September 2012 — Using information obtained and recommendations made by CenterPoint, staff <br />developed a conceptual plan, utilizing new electrical service, distribution boxes, heavy electrical <br />cabling, spider boxes and portable lighting, to come up with a portable system that could meet <br />the future festival needs on Main Street. The system, as envisioned, could also be utilized at <br />other sites throughout the City to provide power for special events and concerts. <br />October, 2012 — Bob Steadman of Complete Electric was engaged as a consultant to flesh out the <br />plan and provide specifications for the needed equipment, and monitor the installation of new, <br />and updates of existing electrical service for Main Street. <br />January, 2013 — Bob Steadman presented design drawings and specifications for equipment to <br />implement the proposed plan. <br />January, 2013 — Staff received additional input that it would be desirable to move toward a more <br />permanent installation of underground conduit utilizing boring and saw cuts of existing concrete, <br />in order to also install a permanent outlet at each of the trees along Main Street. The purpose is to <br />also provide up -lighting and holiday lighting at each tree as well as provide power for festival <br />vendors, portable lighting, and stage amplification. Bob Steadman indicated that the change in <br />direction was beyond his capability to provide the more complicated plans and specifications <br />