My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-13-13 Special Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2013
>
04-13-13 Special Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 10:19:39 AM
Creation date
7/25/2025 3:14:23 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/13/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
required. The project change in direction has delayed the project but it can still be installed prior <br />to our premier event in December. The change will most likely require a budget adjustment as <br />the cost is expected to increase substantially due to the more extensive work required to install. <br />February, 2013 — Staff prepared a new scope of work designed to capture the additional <br />components as outlined, and forward to Purchasing for developing a DESIGN/BUILD Request <br />for Proposal for the work. <br />March, 2013 — Staff received the Draft Design/Build RFP from Purchasing and it is currently <br />under review before providing to potential contractors. <br />Preliminary estimates for the revised scope of work is approximately double the current budget. <br />However, until the City receives proposals for the project, it will be difficult to quantify exact <br />cost increase to the project. At this time, staff is seeking direction on whether the current <br />scope of the project is acceptable to the Council. If it is, staff will proceed by letting the RFP <br />and will be back before Council once those proposals have been received to present firm budget <br />numbers. An additional option is to complete the project in phases, where design occurs this <br />year using existing funding and installation occurs next year by rolling over remaining design <br />funds and the additional allocation, as necessary. <br />Action Required by Council: <br />None. <br />Approved for City Council Aeenda <br />Corby D. Alexander, City Manager Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.