Laserfiche WebLink
Liabilities of Maintaining the Status Quo: <br />Deferred maintenance adds cost and work hours to future budget years. <br />Operating Costs: <br />No new facilities will be added with this project. <br />Other Considerations: <br />Staff considered and investigated options for constructing a second access to the subdivision as <br />an alternate route during construction. The three locations considered are shown on the attached <br />project map. Location #1 included a drive from the existing stubbed street off of Hackberry to <br />McCabe, Location #2 included a drive from Bayou Drive to McCabe (through the HOA park <br />property and 2 to 3others depending on the alignment, Location #3 included an extension of <br />Fairfield Avenue over the bayou (through Shoreacres right-of-way and Shoreacres-owned <br />parcels) to Oak Leaf Avenue. All three optionswere discarded due to the cost of clearing, <br />grading and drainage work sufficient enough for to provide a gravel road for up to 1850 vehicles <br />per day, and the expense of removing the gravel drive and restoring the project area when <br />complete. The expense and complications involved with obtaining offsite easements were also <br />considerations. <br />During construction, the contractor will remove and replace one lane at a time leaving the other <br />lane open for two-way traffic. Staff considered various alternatives available to best maintain <br />traffic during constructionincluding a second subdivision access (discussed above), temporary <br />pavement, temporary traffic signals, and reconstructing the pavement in very short sections <br />where motorists might negotiation a short one-lane segment of roadway without benefit of <br />flaggers. Staff also sought the opinions of the design consultant and two contractorswho are <br />competent in these types of projects. Considering all options and opinions, flaggers with an off- <br />duty police officer on-site around the clock for the period that the road is down to a single lane <br />was selected as the best and safest course of action. <br />There will be periods outside of the morning and evening rush hours where the concrete truck <br />will set up and pour from the remaining lane of traffic. This will close the road to non- <br />emergency traffic for 15 –20 minutes while the concrete truck empties and moves on. <br />Approximately 40 loads of concrete will be required throughout the project.There may also <br />be short periods when left-turning traffic from northbound Hwy 146 into the subdivision will <br />be prohibited to ease the potential for congestion on Old Hwy 146. The contractor and staff <br />will utilize flyers, roadside electronic message boardsand CTY connect throughout the <br />project to provide the residents with as much information as possible. Staff also plans to hold <br />a public meeting for the residents prior to construction. Residents will have the phone <br />numbers for key city personnel should any concerns or problems arise during construction. <br /> <br />