My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11-13 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2013
>
11-11-13 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 10:44:52 AM
Creation date
7/25/2025 3:15:39 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
11/11/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of La Porte <br />October 30, 2013 <br />Page 5 of 5 <br />COMPENSATION: <br />The compensation to be paid to CobbFendley for providing the described engineering services will <br />be as follows: <br />Fairmont Park Phase 1 Paving and Drainage Improvements <br />1) Phase 1 Services (LS) <br />a) Topographic survey.............................................................................................. $11830.00 <br />b) Geotechnical Exploration and Report..................................................................$3 800.00 <br />c) General Design -Paving, Drainage, Traffic Control, Details, SWPPP, <br />Bidding phase services, limited construction admin, and (2) meetings ........ $51,200.00 <br />Phase 1 Services Total...............................................................................................................$70,830.00 <br />Fairmont Park Phase 2 Paving and Drainage Improvements <br />1) Phase 2 Services (LS) <br />a) Topographic survey.............................................................................................. $10,520.00 <br />b) Geotechnical Exploration and Report..................................................................$2,900.00 <br />c) General Design -Paving, Drainage, Traffic Control, Details, SWPPP, <br />Bidding phase services, limited construction admin, and (2) meetings......... $33,700.00 <br />Phase 2 Services Total............................................................................................................... $47,120.00 <br />Fairmont Park Phase 1 & 2 Total............................................................................................ $117,950.00 <br />ADDITIONAL SERVICES: <br />Additional service items that are more general in nature may be defined at a later date. These items, <br />when specifically agreed to in writing by the City and CobbFendley, will be invoiced at direct <br />personnel expense times a multiplier of 2.4 as called for in the original base contract with the City. <br />Additional Services may include such things as: <br />• Construction Surveying or Staking. <br />• Construction period inspection or site visitation services. <br />• Materials testing services (subgrade compaction, lime content, concrete testing.) <br />• Services rendered in resolution of extensive claims by Contractor or City. <br />• Comprehensive review of Bidder Qualifications <br />C:\Users\hlyle\Documents\_PROJECTS\La Porte Fairmont Park\Fairmont Park Proposal.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.