Laserfiche WebLink
BID SPECIFICATION <br />1.3SUBMITTAL DOCUMENTATION <br />The following sections shall be included in Romtec’s Scope of supply, design, and installation <br />submittal. Incompletesubmittals will be rejected and returned to the bidder. <br />A.Introduction <br />B.Scope of Supply –Products & Services <br />C.Products & Services Not Supplied By Romtec <br />D.Project Site <br />E.Warranty & Limitations <br />F.Project Design <br />G.Product Data Sheets <br />H.Installation <br />1.4WARRANTY <br />A.The building and all its associated components shall be warranted against defects in <br />materials and workmanship for a period of not less than one (1) year from date of <br />final acceptance. <br />1.5MAINTENANCE <br />A.Romtecdoes not supply maintenance for the packaged restroom building. <br />Romtec Inc. <br />Page 3of 8 <br /> <br />