My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-24-14 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2014
>
02-24-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 3:00:21 PM
Creation date
7/25/2025 3:16:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
2/24/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID SPECIFICATION <br />PART 2: PRODUCTS <br />Romtec will create plans that will be used to determine quantities, dimensions, locations, and <br />installation methods for the materials and items described in this section. Romtecreserves the <br />right to make substitutions of equivalent materials and items without notice. <br />2.1BUILDING DESCRIPTION <br />A.Building dimensions shall match what is indicated on design criteria and drawings. <br />B.All walls, beams, and roofingstructureto be designed and supplied by Romtec. <br />2.2CAST IN-PLACE CONCRETE <br />A.Includes all materials and labor for foundations/footings, interior slabs, exterior/entry <br />slabs, and sidewalks. <br />B.Equipment, labor & tradesshall be supplied by Romtec. <br />1.All equipment, labor, and trades to build concrete forms and install the <br />reinforced concrete footings and slab. <br />C.Engineered fillshall be supplied by Romtec. <br />1.Engineered fill shall be ¾ in. minus crushed aggregatearound footings, <br />foundationsand slabsas required. <br />D.Slab vapor barrier shall be supplied by Romtec. <br />1.Vapor barrier under concreteslab shall be 6-mil continuousplastic. <br />E.Foundation/footings, interior slabs and exterior/entry slabs shall be supplied by <br />Romtec. <br />1.Romtecshall be responsible for ensuring that the concrete foundation and slab <br />are adequate for the site conditions and the purpose for which the building and <br />foundation/slab are intended. <br />2.Footings will be built to 24 in. depth or local frost depth, whichever is deeper. <br />3.Minimum compressive strength of 3000 psi at 28 days, 4+/-1 in. slump, with <br />max ¾ in. aggregate. <br />4.Interior surfaces and exterior slabsshall have a fine broom finish. <br />Romtec Inc. <br />Page 4of 8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.