Laserfiche WebLink
Liabilities of Maintaining the Status Quo:Liabilities of Maintaining the Status Quo: <br />The scope and cost of the proposed work would likely increase if the proposed resurfacing work is deferred The scope and cost of the proposed work would likely increase if the proposed <br />resurfacing work is deferred <br />for an extended period of time.  for an extended period of time.  <br />  <br />Operating Costs:Operating Costs: <br />No new facilities will be added with this project.  No new facilities will be added with this project.  <br />  <br />Other Considerations: Other Considerations: <br />  <br />Staff plans to also surface the asphalt drive to the new animal shelter on Spencer Highway with this Staff plans to also surface the asphalt drive to the new animal shelter on Spencer <br />Highway with this <br />project.  <br />  <br />Action Required of Council:Action Required of Council: <br />Consider approval or other action authorizing the City Manager to execute a contract with Forde Construction Consider approval or other action authorizing the City Manager to execute <br />a contract with Forde Construction <br />Company Inc. for $577,477.80 including the Base Bid and both Alternate Bid #1 and Alternate Bid #2.  The total Company Inc. for $577,477.80 including the Base Bid and both Alternate <br />Bid #1 and Alternate Bid #2.  The total <br />authorization is $627,000 including the project contingency of 8.5%.  authorization is $627,000 including the project contingency of 8.5%.   <br />  <br />Approved for City Council AgendaApproved for City Council Agenda <br />Corby D. Alexander, City ManagerCorby D. Alexander, City ManagerDateDate <br /> <br />