My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-25-14 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2014
>
08-25-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 10:53:12 AM
Creation date
7/25/2025 3:17:14 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
8/25/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liabilities of Maintaining the Status Quo:Liabilities of Maintaining the Status Quo: <br />The scope and cost of the proposed work would likely increase if the proposed resurfacing work is deferred The scope and cost of the proposed work would likely increase if the proposed <br />resurfacing work is deferred <br />for an extended period of time. for an extended period of time. <br /> <br />Operating Costs:Operating Costs: <br />No new facilities will be added with this project. No new facilities will be added with this project. <br /> <br />Other Considerations: Other Considerations: <br /> <br />Staff plans to also surface the asphalt drive to the new animal shelter on Spencer Highway with this Staff plans to also surface the asphalt drive to the new animal shelter on Spencer <br />Highway with this <br />project. <br /> <br />Action Required of Council:Action Required of Council: <br />Consider approval or other action authorizing the City Manager to execute a contract with Forde Construction Consider approval or other action authorizing the City Manager to execute <br />a contract with Forde Construction <br />Company Inc. for $577,477.80 including the Base Bid and both Alternate Bid #1 and Alternate Bid #2. The total Company Inc. for $577,477.80 including the Base Bid and both Alternate <br />Bid #1 and Alternate Bid #2. The total <br />authorization is $627,000 including the project contingency of 8.5%. authorization is $627,000 including the project contingency of 8.5%. <br /> <br />Approved for City Council AgendaApproved for City Council Agenda <br />Corby D. Alexander, City ManagerCorby D. Alexander, City ManagerDateDate <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.