Laserfiche WebLink
pressure in the system and provide ground water as needed for normal operations and during pressure in the system and provide ground water as needed for normal operations and during <br /> <br />emergency outages.  emergency outages.   <br /> Liabilities:  <br /> Current Request:  The building is obsolete and not up to current codes. The booster pumps are over 50  Current Request:  The building is obsolete and not up to current codes. The booster <br /> pumps are over 50 <br />years old and at the end of their useful service life. The 2009 Water Master Plan for the city identified a years old and at the end of their useful service life. The 2009 Water Master <br /> Plan for the city identified a <br />need for expanded booster pump capacity at this location around 2020.  The age and condition of the need for expanded booster pump capacity at this location around 2020.  The age and <br /> condition of the <br />existing plant infrastructure dictate a need for improvements. existing plant infrastructure dictate a need for improvements.  <br /> Operating Costs:  Operating Costs:  <br /> No significant change in operating costs associated with the Phase II improvements. The operating  No significant change in operating costs associated with the Phase II improvements. <br /> The operating <br />costs will both reduce (due to new equipment) and increase (due to more equipment) with upgrades costs will both reduce (due to new equipment) and increase (due to more equipment) with <br /> upgrades <br />necessary either way to maintain the water plant. necessary either way to maintain the water plant.  <br />Action Required of Council:Action Required of Council: <br />Consider approval or other action authorizing the City Manager to enter into a professional services Consider approval or other action authorizing the City Manager to enter into a professional <br /> services <br />agreement with HDR Engineering in the amount of $93,895 to design Phase II of the Hillridge Water agreement with HDR Engineering in the amount of $93,895 to design Phase II of the Hillridge <br /> Water <br />Plant Improvements including new booster pumps and building. Plant Improvements including new booster pumps and building.  <br />  <br />Approved for City Council AgendaApproved for City Council Agenda <br />Corby D. Alexander, City ManagerCorby D. Alexander, City ManagerDateDate <br /> <br />