Laserfiche WebLink
ElectricalEvaluationΑRev.1ShraderEngineeringInc. <br />CityofLaPorteΑHillridgeWaterPlant <br />Installsolidstatecontrollerandbackupcontrols. <br />Installgroundstoragetankleveltransmitterandbackuplevelpressureswitchesin <br />autosensorypanel. <br />Completedemolitionofexistingbuildingandelectricalequipment.Ifequipmentisin <br />goodcondition,itmaybesalvaged. <br />Phase3ΑGeneratoratRemoteWellSite <br />Installductbankfromautomatictransferswitchtogenerator. <br />Install400KWnaturalgasgeneratorwithsoundattenuationlevel2enclosureat <br />250HPwellsite.Generatorissizedtocarrybothwells. <br />Phase4ΑGeneratoratPlantSite <br />Completeductbankfromautomatictransferswitchtogenerator. <br />Install250KWnaturalgasgeneratorwithsoundattenuationlevel2enclosureat <br />waterplantsite.Generatorissizedtocarryfullloadofwaterplantsite. <br />ProbableCostofConstruction <br />Thefollowingareroughorderofmagnitudeestimatesforthecostofconstructionasdescribed <br />inthisevaluation.Roughorderofmagnitudecostisdefinedas±35%asinstalledthrougha <br />competitivelybidcontract.Estimatescanberefinedduringdetaileddesign. <br />hƦƷźƚƓЊ <br />Phase1$299,200.00$321,900.00 <br />Phase2$618,500.00$665,400.00 <br />* <br />Phase3$677,300.00$731,500.00 <br />Total$1,595,000.00$1,718,800.00 <br />* <br />Phase3withdieselgeneratorand24hoursubbasetank:$435,000.00$469,800.00 <br />hƦƷźƚƓЋ <br />Phase1$263,300.00$282,400.00 <br />Phase2$679,900.00$731,800.00 <br />* <br />Phase3$481,100.00$519,600.00 <br />** <br />Phase4$334,500.00$361,600.00 <br />Total$1,758,800.00$1,895,400.00 <br />6 <br /> <br />