My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-25-16 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2016 (2)
>
07-25-16 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2016 10:09:48 AM
Creation date
7/25/2025 3:21:23 PM
Metadata
Fields
Template:
La Porte TX
Date
7/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ElectricalEvaluationΑRev.1ShraderEngineeringInc. <br />CityofLaPorteΑHillridgeWaterPlant <br />Installsolidstatecontrollerandbackupcontrols. <br />Installgroundstoragetankleveltransmitterandbackuplevelpressureswitchesin <br />autosensorypanel. <br />Completedemolitionofexistingbuildingandelectricalequipment.Ifequipmentisin <br />goodcondition,itmaybesalvaged. <br />Phase3ΑGeneratoratRemoteWellSite <br />Installductbankfromautomatictransferswitchtogenerator. <br />Install400KWnaturalgasgeneratorwithsoundattenuationlevel2enclosureat <br />250HPwellsite.Generatorissizedtocarrybothwells. <br />Phase4ΑGeneratoratPlantSite <br />Completeductbankfromautomatictransferswitchtogenerator. <br />Install250KWnaturalgasgeneratorwithsoundattenuationlevel2enclosureat <br />waterplantsite.Generatorissizedtocarryfullloadofwaterplantsite. <br />ProbableCostofConstruction <br />Thefollowingareroughorderofmagnitudeestimatesforthecostofconstructionasdescribed <br />inthisevaluation.Roughorderofmagnitudecostisdefinedas±35%asinstalledthrougha <br />competitivelybidcontract.Estimatescanberefinedduringdetaileddesign. <br />hƦƷźƚƓЊ <br />Phase1$299,200.00$321,900.00 <br />Phase2$618,500.00$665,400.00 <br />* <br />Phase3$677,300.00$731,500.00 <br />Total$1,595,000.00$1,718,800.00 <br />* <br />Phase3withdieselgeneratorand24hoursubbasetank:$435,000.00$469,800.00 <br />hƦƷźƚƓЋ <br />Phase1$263,300.00$282,400.00 <br />Phase2$679,900.00$731,800.00 <br />* <br />Phase3$481,100.00$519,600.00 <br />** <br />Phase4$334,500.00$361,600.00 <br />Total$1,758,800.00$1,895,400.00 <br />6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.