Laserfiche WebLink
ElectricalEvaluationΑRev.1ShraderEngineeringInc. <br />CityofLaPorteΑHillridgeWaterPlant <br />* <br />Phase3withdieselgeneratorand24hoursubbasetank:$250,700.00$270,800.00 <br />** <br />Phase4withdieselgeneratorand24hoursubbasetank:$208,800.00$225,500.00 <br />hƦƷźƚƓЌ <br />Phase1$263,300.00$282,400.00 <br />Phase2$742,400.00$799,300.00 <br />* <br />Phase3$481,100.00$519,600.00 <br />** <br />Phase4$334,500.00$361,600.00 <br />Total$1,821,300.00$1,962,900.00 <br />* <br />Phase3withdieselgeneratorand24hoursubbasetank:$250,700.00$270,800.00 <br />** <br />Phase4withdieselgeneratorand24hoursubbasetank:$208,800.00$225,500.00 <br />7 <br /> <br />