Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEMREQUEST FOR CITY COUNCIL AGENDA ITEM <br />June 26, 2017June 26, 2017AppropriationAppropriation <br />Agenda Date Requested:Agenda Date Requested: <br />PL0001PL0001 <br />Don PennellDon PennellSource of Funds:Source of Funds: <br />Requested By:Requested By: <br />015.9090.519.1100015.9090.519.1100 <br />Public WorksPublic WorksAccount Number:Account Number: <br />Department:Department: <br />$507,000.00$507,000.00 <br />Report:Resolution:Resolution:Ordinance:Ordinance:Amount Budgeted:Amount Budgeted: <br />  Amount Amount <br />Other: <br />$417,728.00$417,728.00 <br />Requested:Requested: <br />AttachmentsAttachments : : <br />Budgeted Item:Budgeted Item:YESYESNONO <br />1.Bid TabulationBid Tabulation <br />2.G.W. Phillips SubmittalG.W. Phillips Submittal <br />3.Executed agreement for HC Safe Routes Executed agreement for HC Safe Routes <br />to Schoolto School <br />4.Harris County Notice of Bid ApprovalHarris County Notice of Bid Approval <br />5.Engineer's RecommendationEngineer's Recommendation <br />6.TolunayTolunay--Wong Proposal for Materials Wong Proposal for Materials <br />TestingTesting <br />7.RPS Klotz Proposal for Additonal ServicesRPS Klotz Proposal for Additonal Services <br />8.Interlocal Agreement with Harris CountyInterlocal Agreement with Harris County <br />SUMMARY & RECOMMENDATIONSSUMMARY & RECOMMENDATIONS <br />The Park Drive Sidewalk Improvements Project will construct 4,400 LF of sidewalk from S. Lobit to San The Park Drive Sidewalk Improvements Project will construct 4,400 LF of sidewalk <br /> from S. Lobit to San <br />Jacinto and 23 ADA ramps with placement markings and appropriate signage. This stretch of sidewalk Jacinto and 23 ADA ramps with placement markings and appropriate signage. This stretch <br /> of sidewalk <br />will serve as a direct route for pedestrians walking to and from the La Porte High School and the Sea will serve as a direct route for pedestrians walking to and from the La Porte High <br /> School and the Sea <br />Breeze Park, as well as provide connectivity to the Harris County bus stop location at San Jacinto.Breeze Park, as well as provide connectivity to the Harris County bus stop location <br /> at San Jacinto. <br /> On November 4, 2016, City Council authorized execution of an Interlocal Agreement (ILA) that  On November 4, 2016, City Council authorized execution of an Interlocal Agreement (ILA) <br /> that <br />established the project scope and responsibilities for the parties involved. Harris County is to provide a established the project scope and responsibilities for the parties involved. <br /> Harris County is to provide a <br />maximum of $285,600 thru the FTA Program and the Citymaximum of $285,600 thru the FTA Program and the City’’s fund match is $71,400.00.  There is s fund match is $71,400.00.  There is <br /> <br />additional funding of $150,000.00 from Harris Countyadditional funding of $150,000.00 from Harris County’’s Safe Routes to School Program. s Safe Routes to School Program.  <br /> Bid # 17003 for the Park Dr. Sidewalk Project was advertised on April 5 and April 12 in the Houston  Bid # 17003 for the Park Dr. Sidewalk Project was advertised on April 5 and April <br /> 12 in the Houston <br />Chronicle, April 6 and April 13 in the Bay Area Observer, posted on Public Purchase and the CityChronicle, April 6 and April 13 in the Bay Area Observer, posted on Public Purchase and <br /> the City’’s s <br />website.  Forty vendors downloaded the bid.website.  Forty vendors downloaded the bid. <br /> Bid #17003 was open and read on April 17, 2017. Six bids were received. G.W. Phillips submitted the  Bid #17003 was open and read on April 17, 2017. Six bids were received. G.W. Phillips <br /> submitted the <br />low bid at $369,376.00, which includes the base bid ($335,186.00), Alternate Bid 1 ($16,500.00) for low bid at $369,376.00, which includes the base bid ($335,186.00), Alternate Bid 1 <br /> ($16,500.00) for <br />landscape block wall where 3:1 ditch slope cannot be established and Alternate Bid 2 ($34,190.00) for landscape block wall where 3:1 ditch slope cannot be established and Alternate Bid <br /> 2 ($34,190.00) for <br />drainage pipe and inlets at Ohio and Idaho. drainage pipe and inlets at Ohio and Idaho.  <br />  Additional Professional Services:Additional Professional Services:  RPS Klotz submitted a proposal for Additional Services for the   RPS Klotz submitted a proposal for Additional Services <br /> for the <br />construction phase, to review, sign and document Harris County approval on all invoices as required in construction phase, to review, sign and document Harris County approval on all <br /> invoices as required in <br />the inter-local agreement. The addition of services has a total amount of $4,920.00local agreement. The addition of services has a total amount of $4,920.00 <br /> Tolunay- Wong Engineers, Inc. submitted a proposal for In Wong Engineers, Inc. submitted a proposal for In--Place Soil Compaction and Cast InPlace Soil Compaction and Cast In--Place <br /> Place <br />Concrete testing as required in the interConcrete testing as required in the inter--local agreement. The addition of services has a total amount of local agreement. The addition of services <br /> has a total amount of <br />$5,845.00. <br /> <br />